background image

 

11 

4. 

Take  out  the  isolation  from  the  upper  part  of  the  jacket.  Thermomanometer  to  be  built  –  in  to  the  control  box  and  the  aggregate  to  be 
screwed to the upper part of the jacket. Before putting on of the upper part of the jacket to the boiler it is necessary to put on the isolation 
back, insert the thermometer sensor to the thermometer sump and the manometer sensor to be screwed to the manometer sump. 

5. 

To put on the back part of the jacket with isolation behind the screw – knobs C 4,8 x 13. 

6. 

To complete the smoky flap control according to the Fig. 

. 10. 

7. 

To screw the brush to the shaft socket. 

 

 

Fig. 

. 11 

Boiler jacket design 

 

5.3.3 

Filling of the heat system with water 

Water for filling of the boiler and the heat system must be pure and colourless, without suspended substances, oil and chemically aggressive 
substances. Its hardness must correspond to 

Č

SN 07 7401 and in case it does not correspond it is necessary the water to be adjusted. Even 

multiplying heating of the water with higher hardness does not prevent from excluding of soils on the boiler drum walls. The precipitation of 1 
mm of limestone reduces in the given place the heat transfer from metal to water by 10 %.  

Heat systems with an open expansive tank allow direct contact of the heat water with atmosphere. In the heat period the expansive water in the 
tank absorbs oxygen that increases the rust effects and at the same time a considerable vaporization of water occurs. Only water adjusted to 
values according to 

Č

SN 07 7401 can be used for fill – up. The heat system is needed to be rinsed so as all impurities have been washed out. 

During  heat  period  it  is  necessary  to  keep  consistent  water  volume  in  the  heat  system.  While  filling  –  up  of  the  heat  system  with  water  it  is 
necessary to prevent the air from leeching onto the system. The water from boiler and heat system must never be impregnated or taken out for 
use except for cases necessarily needed such as repairs, etc. By draining the water and filling with new one the risk of rust and scale creation is 
increased. If it is needed to fill water into the heat system we fill it only to a cooled down boiler to prevent section cracking. After filling 
of the boiler and heat system checking of tightness of all joints is needed. 

The finishing of assembly and the heat test performance must be recorded in the warranty card. 
 

 

OS 05 controlling box with 
thermomanometer 

 

Thermometer sensor 

 

Upper part of the jacket with isolation 
  
Heat water output 

 

Smoky chimney – pot socket 
Back part of the jacket with isolation 
 
Sump for thermometer and thermostat 
sensor 
Anchor screw 

 

Stoker – hole 
Returnable water input 
Returnable water flange with impregnating 
and clearing plug 

 

 
Right side part of the jacket with isolation 
 
Air rose 
 
Stoker – hole handle 

 

Ash door 
Boiler drum 
Stifling controlling rod 
 

Thermomanometer

Manometer sensor

Draught controller

Rod of the draught controller

Flange of the heat water

Smoky chimney – pot

Chainlet

Cleaning cover

Sump for manometer sensor

Smoky flap controlling

Connecting pin of the jacket

Screw

Stoker door

Controlling handle of the 

smoky flaps

Ash door handle

Jacket bracket

Left side part of the jacket 

with isolation

Stifling

Stifling screw

 

Содержание U 22 D

Страница 1: ...VIADRUS U 22 C D Manual for boiler operation and installation GB_2015_24 GB_2017_14 ...

Страница 2: ...Boiler drum installation 10 5 3 2 Jacket assembly 10 5 3 3 Filling of the heat system with water 11 6 Putting into operation instructions for a contractual service organization 12 6 1 Control operation before starting 12 6 2 Putting the boiler into operation 12 6 3 Boiler transformation from solid fuels to gas and liquid fuels and retroactively 12 7 User s boiler service 12 7 1 Heating up 13 7 2 O...

Страница 3: ... cast iron exchanger and all other parts with respect to the quality of used materials 2 Design approved in the long term 3 Elaborate production technology on automatic forming lines with consistent and approved quality of the production process ISO 9001 ISO 14 001 4 Efficiency of coke and anthracite burning 75 80 efficiency of wood burning 75 5 Simple service and maintenance 6 Low demandingness f...

Страница 4: ...tuated at the back part of the boiler The back section of the boiler has a smoky chimney pot and a heat water flange in the upper part and a returnable water flange with a socket for impregnating and clearing plug Stoker and ash door and a firebox door under them are fixed to the front section The whole boiler drum is isolated with a stifling mineral isolation that reduces losses by sharing heat i...

Страница 5: ...er Cleaning cover of the chimney pot Back part of the jacket with isolation Flange of the returnable water with a socket Elbow clearing plug Firebox door Medium section Ashtray Control handle of the smoky flap Thermomanometer Draught governor Upper part of the jacket with isolation Stoker door Stoker door closure Air rose Ash door Ash door closure Stifling Hanging pin Adjusting screw of the stifli...

Страница 6: ...screw of the stifling Front section Boiler insertion Back section Three figure sump Flange of the heat water Smoky chimney pot Flat socket of the smoky chimney pot Smoky flap Lever Cleaning cover of the chimney pot Back part of the jacket with isolation Flange of the returnable water with a socket Elbow clearing plug Firebox door Medium section Ashtray Control handle of the smoky flap Medium secti...

Страница 7: ... Concentration of total Fe Mn mg l 0 3 recommended value WARNING The use of anti freeze mixture is not recommended by the manufacturer a to the heating system ČSN 06 0310 Heating systems in buildings Designing and installation ČSN 06 0830 Heating systems in buildings protecting device CSN 07 0240 Warm water and low pressure steam boilers Basic regulations CSN 07 0245 Warm water and low pressure st...

Страница 8: ...e materials polyurethane polystyrene polyethylene PVC The boiler placing with respect to the necessary handling space basic surroundings of AA5 AB5 according to ČSN 33 2000 1 ed 2 handling space of minimum 1000 mm in front of the boiler must be maintained a minimum distance of 400 mm between the back part of the boiler and the wall to maintain space for access to the back part of the boiler of min...

Страница 9: ...s 3 x 26 1 piece split pin 2 5 x 32 1 piece washer 10 5 3 pieces bushings HEYCO 2 pieces blind flanges 6 pieces screws into metal C 4 8 x 13 4 pieces flange of heat water DN 50 1 piece flange of returnable water DN 50 with a socket Js 1 2 for impregnating and clearing plug 1 piece well of thermostat 1 piece sealing φ 90 x 60 x 3 2 pieces operating key 1 piece hook 2 pieces socket 8 mm 2 pieces boi...

Страница 10: ...the well of thermostat into the hole in the top part of the rear section Fig 7 6 To put the stove pipe to the smoky chimney pot and penetrate it into the chimney hole 7 To screw the draught controller to the hole in the upper part of the front section 8 Two holes with a Js 6 4 thread in the front section to blind with Js 6 4 closures Fig 8 The boiler connecting dimensions 5 3 2 Jacket assembly 1 T...

Страница 11: ...01 can be used for fill up The heat system is needed to be rinsed so as all impurities have been washed out During heat period it is necessary to keep consistent water volume in the heat system While filling up of the heat system with water it is necessary to prevent the air from leeching onto the system The water from boiler and heat system must never be impregnated or taken out for use except fo...

Страница 12: ...CITE The optimal fuel is coke with granularity of 40 60 mm but it is possible to burn even coke and anthracite with granularity of 20 40 mm nut 2 In case of sufficient chimney draught 0 15 to 0 25 mbar it is possible to burn even non caking anthracite with granularity of 30 50 mm nut 1 and 50 80 mm cobbles WOOD Guarantee of clean and good combustion is to use only dry and wood in the natural state...

Страница 13: ...n smaller quantity than during typical burning Coal will burn slower and with less intensiveness temperature will increase slower but it is a normal phenomenon As soon as a burning layer arises white smoke begins to decrease 10 As soon as the fuel passes to dark red glow it is necessary to close the throttle valve by about 1 2 mm and close the rosette of the stocking door 11 From this time you can...

Страница 14: ... eventually coke when setting the boiler to the maximum operating temperature 9 IMPORTANT NOTICE 1 The boiler VIADRUS U 22 is not intended for the Czech market 2 The boiler only can be used for the purpose that it is destined for 3 The boiler must be operated only by adults who are introduced to these operating instructions It is unallowable to let children at the boiler unattended of adults Inter...

Страница 15: ...er a consumer Mainly it is necessary to specify when and by whom the boiler was commissioned as well as it is necessary to specify a precise address of operation of the boiler VIADRUS a s provides the extended guarantee period for the boiler drum during 60 months from the sell by date but not longer than 66 months from the dispatch date of the product from the production plant The condition for re...

Страница 16: ...70 and fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 75 Energy efficiency index EEI 74 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 11 7 kW At rated heat output ƞn 75 3 At 30 50 of rated heat output if applicabl...

Страница 17: ...ssil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 75 Energy efficiency index EEI 74 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 17 7 kW At rated heat output ƞn 77 2 At 30 50 of rated heat output if applicable Pp kW A...

Страница 18: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 62 Energy efficiency index EEI 92 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 20 kW At rated heat output ƞn 63 6 At 30 50 of rated heat output if applicable Pp kW A...

Страница 19: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 64 Energy efficiency index EEI 92 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 25 kW At rated heat output ƞn 65 6 At 30 50 of rated heat output if applicable Pp kW A...

Страница 20: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 66 Energy efficiency index EEI 95 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 30 kW At rated heat output ƞn 67 6 At 30 50 of rated heat output if applicable Pp kW A...

Страница 21: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 68 Energy efficiency index EEI 98 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 35 kW At rated heat output ƞn 69 7 At 30 50 of rated heat output if applicable Pp kW A...

Страница 22: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 65 Energy efficiency index EEI 94 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 40 kW At rated heat output ƞn 66 6 At 30 50 of rated heat output if applicable Pp kW A...

Страница 23: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 62 Energy efficiency index EEI 89 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 45 kW At rated heat output ƞn 63 5 At 30 50 of rated heat output if applicable Pp kW A...

Страница 24: ...fossil fuel briquettes no no Other blend of biomass and fossil fuel no no Characteristics when operating with the preferred fuel Seasonal space heating energy efficiency ηs 64 Energy efficiency index EEI 92 Item Symbol Value Unit Item Symbol Value Unit Useful heat output Useful efficiency At rated heat output Pn 49 kW At rated heat output ƞn 65 5 At 30 50 of rated heat output if applicable Pp kW A...

Страница 25: ...kaging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure that calorific gain is achievable for the functional packaging unit EN 13431 YES Iron NO 3 3 Recovery by composting ensure compost ability in all terms of the standard for the functional packaging unit ...

Страница 26: ...26 ...

Страница 27: ... card for customer user Recording of performed warranty and after warranty repairs and performance of regular product check Recording date Performed operation Contractual service organization signature stamp Customer s signature ...

Страница 28: ...VIADRUS U 22 C D VIADRUS a s Bezručova 300 E mail CZ 735 81 Bohumín info viadrus cz www viadrus cz ...

Отзывы: