Servicing
42
11.4 LIK 60/100, 80/125 system connection
For connection of the LIK 80/125 system it
is necessary to use a 60/100 reducer
piece
4 measuring piece
5 blinding plug D80
8 exchanger reducer piece
Preparation of connection of the terminal
part of the LIK system for connection to
the NAOS boiler – the outside air supply
pipe shall be by 35 mm shorter than the
flue gas removal pipe. It is necessary to
ensure a gap of 10 – 15 mm between the
exchanger and the air supply pipe to
ensure air supply to the boiler.
When the flue duct diameter is 80/125 mm
the diameter of the connecting piece is
60/100 mm. Then the diameter needs to
be converted from 60/100 to 80/125 mm.