background image

 

  49

 

16.  Defects and their elimination (rectification) 

 

The  defects  can  only  be  eliminated  by  a  trained  contractual  service  organization  which  is  also  obliged  to 
enter the repair in the guarantee certificate.  

 

The defects market with symbol “

∗∗∗∗

„ can be eliminated by the user himself.  

 

If the safety thermostat or the combustion products return flow fuse get repeatedly blocked it is also 
necessary to call a contractual service worker. 
 

 

DEFECT 

REASON 

 

ELIMINATION  

1. 

After having switched on the boiler 
the  control  lamp  on  the  main 
switch does not light up  

No voltage on the boiler inlet  

 

Check the voltage in the socket 

Faulty control lamp 
Faulty fuse 

 

Exchange the switch 
Exchange the fuse 

2. 

Boiler  cannot  be  started  –  the 
ignition  electrode  for  pilot  burner 
ignition does not sparkle.  
 

Faulty automatics 

 

Exchange the automatics 

Interrupted inlet to the ignition  

 

Check  the  perfect  connection  between 
the  electrode  and  the  HV  output  to  the 
automatics 

Faulty electrode 

 

Exchange the electrode 

3. 

Boiler 

cannot 

be 

started 

– 

sparkling  runs  in  the  automatics 
spark  gap  (discharger)  (audible 
sparkling sound in automatics)  
(only the natural gas)  

Wrong spark gap(discharger) 
 setting 

 

Adjust according to Fig. no. 4a, 4b 

Wrong  conductors  connection  to 
electrodes or a faulty electrode  

 

Check  the  electrodes  condition  and 
connection 

of 

ignition 

and 

earth 

conductor  

4. 

Boiler  doesn’t  ignite  -  the  ignition 
electrode  is  sparkling–  Hon.  Ts´= 
55 s; SIT Ts´= 60 s (on the burner 
automatics  the  „ALARM“  control 
lamp  lights  up  in  the  automatics 
with signalisation 

Boiler gas supply is interrupted 

 

Check  the  gas  pressure  in  gas 
connection  

*  Check  the  appliance  gas  closure 

opening  

Gas piping air lock  

 

Bleed the piping  

Gas valve does not open  

 

Valve exchange 

5. 

Boiler lit but is out immediately  
(on  the  burner  automatics  the 
„ALARM“ 

signal 

lamp 

of 

automatics with signalisation lights 
up) 
  

Wrong  connection  between  the 
zero and phase conductors 
 

 

Check and exchange the connection 
terminal U – phase conductor  
terminal N – zero conductor 

Wrong  diameters  of  gas  nozzles  in 
burner  

 

Check  whether  the  nozzles  diameter  in 
the  main  burner  corresponds  to  the 
values in tables no. 2 – 5. 

Impassable 

filter 

of 

course 

impurities on gas valve inlet 

 

Clean the gas valve filter by blowing out 
(in 

case 

of 

fine 

impurities 

the 

dimensions  of  which  are  the  same  as 
the  filter  mesh  diameter  the  whole  gas 
valve must be exchanged)  

6. 

Boiler  cannot  be  ignited–  the 
safety  thermostat  switched  off  (on 
the  control  panel  in  the  network 
module the exceeded temperature 
signal lamp lights up)  

Faulty boiler thermostat 

 

Exchange the boiler thermostat 

 

*  Unblock  the  thermostat  in  network 

module - TB 

Insufficient water circulation  
(the pump doe not work) 

*  Switch over the revolutions 
 

Check  the  pump  operation  (release  the 
rotor) 

 

 

Exchange the pump 

filter clogged before the pump  

*  Clean the filter 

Lack of water in the system 

*  Check the water pressure in the system 

and possible water refilling  

 

Check  the  pressure  in  the  expansion 
tank (if a closed heating system is used) 

*  Check the three-way valve  

(if the HWS heating is connected)  

7. 

Boiler  does  not  switch  over 
between  the  rated  and  reduced 
output  at  the  temperature  set  on 
the  outdoor  thermostat  and  the 
reduced  output  switch  is  in 
position  “I”  (only  at  the  boiler 
equipped with double stage gas 
valve)
  

Faulty outdoor thermostat 

 

If need be exchange outdoor thermostat 

Interrupted connection between the 
outdoor thermostat and the boiler 

 

Check the connection  

Faulty High-Low coil 

 

Exchange the coil 

Содержание GARDE G 42 ECO

Страница 1: ...Hercules U26 N vod k obsluze VIADRUS GARDE G 42 ECO MANUAL FOR BOILER OPERATION AND INSTALLATION...

Страница 2: ...31 9 Positioning and installation 33 9 1 Regulations and directions 33 9 2 Positioning possibilities 35 10 Delivery and assembly 36 10 1 Delivery and accessories 36 10 2 Assembly procedure 37 11 Commi...

Страница 3: ...x x x x x x 5 sect x x x x x x x x x x x x 6 sect x x x x x x x x x x x x 7 sect x x x x x x x x x x x x NG boiler 1 stage gas valve 2 sect x x x x x x x x 3 sect x x x x x x x x x x x x 4 sect x x x...

Страница 4: ...x x x x x x x x Propane boiler 1 stage gas valve 2 sect x x x x x x x x 3 sect x x x x x x x x x x x x 4 sect x x x x x x x x x x x x 5 sect x x x x x x x x x x x x 6 sect x x x x x x x x x x x x 7 se...

Страница 5: ...nnection the boiler is adjusted to the connection of the stack hot service water heater ensuring the service water preferential heating The low temperature cast iron boiler VIADRUS by its top quality...

Страница 6: ...tees its preferential heating 13 Simple operation and maintenance The boiler drum can be easily cleaned mechanically by using the enclosed brush 14 The boiler can also be installed in the spaces where...

Страница 7: ...um heat output mbar 13 7 13 2 15 8 14 2 14 7 14 3 Gas overpressure on burner nozzles at minimum heat output mbar 6 8 7 8 8 9 10 8 10 6 Number of cool sticks on a tube pc 2 3 3 3 3 3 Number of nozzles...

Страница 8: ...Gas overpressure on burner nozzles at maximum heat output mbar 13 2 14 9 14 8 14 7 14 9 15 2 Gas overpressure on burner nozzles at minimum heat output mbar 8 7 6 9 8 11 4 10 9 Number of nozzles pc 1 2...

Страница 9: ...Cast iron 42 2420 with laminated graphite is the main part of the boiler The boiler construction corresponds to the strength requirements according to SN 07 0240 Warm water and law pressure steam boi...

Страница 10: ...er tubes through the diffusers The gas distributor incl the gas nozzles is welded to the burner plate Pressure loss flow diagram pz Q diagram VIADRUS G42 boiler 0 1000 2000 3000 4000 5000 6000 7000 80...

Страница 11: ...entral section 30 Boiler insertion 47 diameter 31 Anchor screw 32 Distribution pipe 33 Inlet tube 34 Outlet pipe 35 Thermostat reservoir 36 Return valve to the thermomanometer 37 Earth screw 38 Upper...

Страница 12: ...designated for propane combustion is equipped with 1 SINGLE STAGE COMBINED ELECTROMAGNETIC VALVE HONEYWELL VK 4100 A 1002 fig no 26 The boiler can only be operated at the output which stated in tab n...

Страница 13: ...lektroda roub elektrod zapalovac elektroda Fig no 4a Polidoro ignition pilot burner zapalovac elektroda hl dac elektroda Fig no 4b Furigas ignition pilot burner izolace ho kov desky zapalovac ho ek ho...

Страница 14: ...of the right outer section 5 1 1 Equitherm regulation Optionally together with boiler there is delivered one of four kinds of regulation or their combination according to the purchase order key stated...

Страница 15: ...ing valves Other regulator characteristics The heating circuits can be preset as independent two independent heating circuits or as dependent floor heating combined with radiators The independent sche...

Страница 16: ...n products thermostat H2 failure signalling BT1 safety thermostat BT4 boiler thermostat BT6 outdoor thermostat S2 reduced rated output switch Y3 2 valve coil M9 combustion products ventilator E1 ignit...

Страница 17: ...r colour GNYE green yellow RD red BK black BN brawn BU blue Z1 suppression component X1 X11 boiler terminal boards M9 combustion products ventilator Y3 2 valve coil BT6 outdoor thermostat Y2 three way...

Страница 18: ...boards A1 ionising automatics SIT 537 201 ABC Y1 gas valve SIGMA 843 E1 ignition electrode E2 ionising electrode BT2 combustion products thermostat BT1 safety thermostat BT4 operating thermostat S1 ma...

Страница 19: ...failure signalling BT1 safety thermostat BT4 boiler thermostat BT6 outdoor thermostat S2 reduced rated output switch Y3 2 valve coil M9 combustion products ventilator E1 ignition electrode E2 ionising...

Страница 20: ...component X1 X11 boiler terminal boards M9 combustion products ventilator Y3 2 valve coil BT6 outdoor thermostat Y2 three way valve Q1 circulation pump BT8 circulation pump thermostat BT7 HWS heater t...

Страница 21: ...S4565 BF 1112 1 Y1 gas valve VK 4100 Q 2003 B E1 ignition electrode E2 ionising electrode BT2 combustion products thermostat BT1 safety thermostat BT4 operating thermostat S1 main switch H1 boiler un...

Страница 22: ...1 BT2 combustion products thermostat H2 failure signalling BT1 safety thermostat BT4 boiler thermostat M9 combustion products ventilator E1 ignition electrode E2 ionising electrode Y1 VK4100 A 1002 ga...

Страница 23: ...tics Z1 suppression component X1 X11 boiler terminal boards M9 combustion products ventilator Y2 three way valve Q1 circulation pump BT8 circulation pump thermostat BT7 HWS heater thermostat BT5 indoo...

Страница 24: ...l S4565 BF 1112 1 Y1 gas valve VK 4100 A 1002 E1 ignition electrode E2 ionising electrode BT2 combustion products thermostat BT1 safety thermostat BT4 operating thermostat S1 main switch H1 boiler und...

Страница 25: ...e signalling BT1 safety thermostat BT4 boiler thermostat M9 combustion products ventilator E1 ignition electrode E2 ionising electrode Y1 VK4100 A 1002 gas valve A1 S 4565 BF 1112 1 Honeywell automati...

Страница 26: ...er terminal boards M9 combustion products ventilator Y2 three way valve Q1 circulation pump BT8 circulation pump thermostat BT7 HWS heater thermostat BT5 indoor thermostat drum Y5 gas valve at the res...

Страница 27: ...omatics Honeywell S4565 BF 1112 1 Y1 gas valve VK 4100 A 1002 E1 ignition electrode E2 ionising electrode BT2 combustion products thermostat BT1 safety thermostat BT4 operating thermostat S1 main swit...

Страница 28: ...A4 the pump operation is controlled according to regulator programme see chap 5 1 Fig no 10 Grundfos UPS 25 40 pump characteristics 7 Stack hot service water heaters 7 1 Technical data of recommended...

Страница 29: ...hey die within several seconds 7 2 Heater construction To the boiler you can order VIADRUS OV 100L separate stack heater for a preferential hot service water preparation in the same design as G 42 boi...

Страница 30: ...ock 16 radiator vale Note It is possible to use a combined fitting consisting of a safety valve and a clack valve Hot service valve inlet Cold service water inlet heating water inlet return water inle...

Страница 31: ...rom the gas fuel appliances on the exterior wall fa ade This complementary equipment can be used in the whole output range of boilers designated for natural gas combustion Two sectional boilers can on...

Страница 32: ...calculation according to tab no 9 must be observed it means the max value of flow resistance coefficient must not be exceeded The combustion products draw off ventilator OSV is put on the boiler drau...

Страница 33: ...the wall must be equipped with an end piece see fig no 15 16 The whole smoke flue assembly is limited by the used elements see tab no 9 When assembling the smoke flue for 8 34 kW output the flow resi...

Страница 34: ...rs or digits Implementing regulations SN 33 1500 Electrical regulations Electrical equipments revision SN 33 2000 1 ed 2 Low voltage electrical installations Part 1 Fundamental principles assessment o...

Страница 35: ...elves even after removal of ignition source such as paper cardboard asphalt and tar paper wood and wood fiber boards plastics floor coverings the safe distance has to be doubled i e to 400 mm safe dis...

Страница 36: ...d accessories to all boiler variants Conductor inlets PG 9 4 pcs Conductor inlets PG 11 4 pcs Blind flanges PG 9 4 pcs Blind flanges PG 11 4 pcs Automatic bleeder valve 1 pc TE joint reduced 90 1 x 1...

Страница 37: ...to the project documentation We recommend to transport the boiler to the determined standpoint while on a pallet possibly still wrapped in protective packing If this isn t possible due to the space re...

Страница 38: ...495 665 665 T1 202 202 202 245 330 330 B 485 485 485 570 740 740 L 733 733 733 733 773 773 Fig no 20 Dimensions for connection 7 Install the water heater if it is required In order to ensure the prefe...

Страница 39: ...treated to the values according to SN 07 7401 12 Bleed the heating system 13 Boiler must be properly earthed For grounding there is used an external protective clamp in the rear part of boiler 14 Fil...

Страница 40: ...n the RESET push in network h Check the lighting of the main burner by means of ignition pilot burner applies to or boilers in propane design check with boiler gas supply closed check the gas pressure...

Страница 41: ...n products into the boiler room 8 Reinstall the original connection switch off the burner through the operating thermostat ventilator must also stop 11 3 Boiler heat output setting and adjustment Outp...

Страница 42: ...ew for reduced output setting cap 6 3 mm AMP terminals 6 3 mm AMP protective terminal M5 pressure feedback connection High Low coil Gas outlet pressure measuring pressure on the burner nozzles Gas out...

Страница 43: ...Smooth start regulation starting regime setting Honeywell VK 4100Q 2003 valve is by its manufacturer set to the slowest start see fig no 27 MIN curve In case of need to change the opening characterist...

Страница 44: ...n the burner 4 Adjust the boiler output according to chap no 11 3 5 The service worker is obliged to put a new boiler label on the boiler with all necessary data for a given kind of fuel This change m...

Страница 45: ...ly to the central heating After the water heater has been heated to the required temperature the three way valve switches automatically to the heating position and heating water from boiler flows into...

Страница 46: ...mp lights up on boiler control panel The thermostat can be unblocked by user in the network module TB Safety thermostat switching off can be caused by several reasons see chapter no 16 8 Combustion pr...

Страница 47: ...er The user can unblock the fuse by means of TS unblocking push button The boiler can only be restarted once the combustion products return flow fuse sensor has cooled down it means after 10 minutes 9...

Страница 48: ...ilot burner see Fig 4a or 4b and then the whole burner remove the dust from ignition pilot burner by using the compressed air 11 Mount back the draught diverter insulation and the upper part of boiler...

Страница 49: ...pening Gas piping air lock Bleed the piping Gas valve does not open Valve exchange 5 Boiler lit but is out immediately on the burner automatics the ALARM signal lamp of automatics with signalisation l...

Страница 50: ...administration execution in certified branches and on State electricity inspection and SN 38 6405 EN 1775 to inspect the gas boiler regularly once a year The inspections can only be done by an author...

Страница 51: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...

Страница 52: ...52...

Страница 53: ...ion and operation manual will be carried out by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the manufa...

Страница 54: ...tificate for customer the user Record of accomplished guarantee and after guarantee repairs and regular annual product checks Record date Carried out activity Contracting service organization stamp si...

Страница 55: ...nstallation and operation manual will be carried out by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by th...

Страница 56: ...56...

Страница 57: ...llation and operation manual will be carried out by a contracting service organization The completeness and the output adjustment according to Operation and installation manual is guaranteed by the ma...

Страница 58: ...58...

Страница 59: ...59...

Страница 60: ...60 Date of revision 16 2013 GB...

Отзывы: