Positioning and installation 

6.1 

Regulations and guidelines  

 

The boiler can only be installed by a firm holding the valid licence that applies to the installation and 
a maintenance of gas appliances. A project according to the valid regulations must be elaborated for 
the installation. 
The  heating  system  must  be  filled  with water,  that  meets  the 

Č

SN  07  7401  requirements,  especially 

its harness must not exceed the required parameters.  

Recommended values  

Hardness 

mmol/l 

Ca

2+

 

mmol/l 

0,3 

Concentration of total Fe + Mn 

mg/l 

(0,3)* 

*) recommended value  

WARNING!!! The use of anti-freeze mixture is not recommended by the manufacturer.  

a) to the heating system  

Č

SN 06 0310 

Heating systems in buildings – Designing and installation  

Č

SN 06 0830 

Heating systems in buildings – protecting device 

Č

SN 07 7401 

Water  and  steam  for  thermal  energy  equipments  with  working  pressure  up  to  
8 MPa 

EN 297  

Gas – fired central heating boilers – Type B

11

 and  B

11BS 

fitted  with atmospheric 

burners of nominal heat input not exceeding 70 kW. 

EN 656  

Gas  –  fired  central  heating  boilers  –  Type  B  boilers  of  nominal  heat  input 
exceeding 70 kW but not exceeding 300 kW 

b) to the gas distribution 

EN 1775 

Gas  supply  -  Gas  pipework  for  buildings  -  Maximum  operating  pressure  less 
than or equal to 5 bar - Functional recommendations. 

EN 12007-1  

Gas  supply  systems  –  Pipelines  for  maximum  operating  pressure  up  to  and 
including 16 bar – Part 1: General functional recommendations 

EN 12007-2  

Gas  supply  systems  –  Pipelines  for  maximum  operating  pressure  up  to  and 
including 16 bar – Part 2: Specific functional recommendations for polyethylene 
(MOP up to and including 10 bar) 

EN 12007-3  

Gas  supply  systems  –  Pipelines  for  maximum  operating  pressure  up  to  and 
including 16 bar – Part 3: Specific functional recommendations for steel 

EN 12007-4  

Gas  supply  systems  –  Pipelines  for  maximum  operating  pressure  up  to  and 
including 16 bar – Part 4: Specific functional recommendations for renovation 

Č

SN 07 0703 

Boiler room with gas fuel –operated equipments 

Č

SN 38 6405 

Gas equipments. Operating principles 

Č

SN 38 6420 

Industrial gas pipelines  

Act  no.  222/94  Coll.  on  the  conditions  of  enterprise  and  public  service  performance  in  power  industry 

sector and on the state energy inspection  

Promulgation 91/93 Coll. of Czech work safety office regarding the work safety assurance in low-pressure 

buildings  

c) to the electrical network  

Č

SN 33 0165 

Electrical  regulations.  Marking  the  conductors  with  colours  or  digits. 
Implementing regulations

.

 

Č

SN 33 1500 

Electrical regulations. Electrical equipments revision  

Č

SN 33 2000-3  

Electrical  regulations.  Electrical  equipments  Part  3:  Setting  the  basic 
characteristics. 

Č

SN 33 2000-4-41 

Electric  equipments:  part  4:  Safety  chap.  41:  Protection  against  electrical 
accident.

 

Č

SN 33 2000-5-51 ed. 2  Electrical regulations. Electrical equipments construction. 

 

Č

SN 33 2130 

Electrical regulations. Internal wiring.  

Č

SN 33 2180 

Electrical regulations. Connection of electrical devices and appliances. 

Č

SN 34 0350 

Electrical  regulations.  Regulations  for  mobile  connections  and  cord  extension 
sets. 

EN 60 335-1 ed.2 

Household  and  similar  electrical  appliances  –  Safety  –  Part  1:  General 
requirements. 

EN 60 335-2-102 

Household  and  similar  electrical  appliances  –  Safety  –  Part  2-102:  Particular 
requirements  for  gas,  oil  and  solid-fuel  burning  appliances  having  electrical 
connections. 

Содержание G 90 Series

Страница 1: ...Hercules U26 N vod k obsluze VIADRUS G 90 MANUAL FOR BOILER OPERATION AND INSTALLATION...

Страница 2: ...ion 25 7 1 Checking activity before commissioning 25 7 2 Commissioning 25 7 3 Setting and regulation of the boiler heat output 25 7 3 1 Setting and regulation of the boiler heat output for 8 sectional...

Страница 3: ...network module At request a delivery in a decomposed state is possible The accessories delivered at request are not included in the boiler basic price regulation A1 A4 according to the order specifica...

Страница 4: ...hand side or from the right hand side it doesn t apply to the 8 sectional version 9 Possibility to connect the boiler in an cascade 10 Possibility to equip with an equitherm regulation 11 Two stage bu...

Страница 5: ...mal output m 3 m 3 20 18 15 8 21 6 18 13 Volume of dry combustion gases actual at the minimum thermal output m 3 m 3 23 63 20 1 24 8 23 6 Emission values CO mg m 3 5 6 8 7 NOx mg kWh 33 33 27 23 Grade...

Страница 6: ...t a part of which is the protective plate made of the stain steel The atmospheric burner composed of oval low emission burner tubes is made of the stain steel Individual tubes are mounted on the burne...

Страница 7: ...7 Number of sections 8 10 12 15 L mm 995 1155 1315 1555 L1 mm 815 975 1135 1375 A mm 878 5 941 941 941 D mm 200 200 225 250 Fig no 2 The main dimensions of the boiler Gas inlet...

Страница 8: ...8 1 boiler drum 2 boiler shell 3 regulation and safety elements 4 gas fitting 5 horizontal draught diverter 6 atmospheric burner Fig no 3 Boiler assembly...

Страница 9: ...r one of four kinds of regulation or their combinations according to the ordering key stated in chapter no 1 1 The regulators are delivered in a separate package and in place of boiler installation th...

Страница 10: ...mixing valves Other regulator characteristics are as follows the heating circuits can be set as independent two separate heating circuits or as dependent floor heating in combination with radiators a...

Страница 11: ...tab no 2 setting to the given nominal heat output is done by the manufacturer It works in the regime of a nominal reduced heat output Fig no 4 VR 4601 QB 2001 with High Low coil reel and the output to...

Страница 12: ...closing the ionisation circuit there will open the main valve for gas inlet into the main burner In case that the pilot burner hasn t ignited within the safety time of Ts 50 sec the automatics will cl...

Страница 13: ...on electrode F1 Fuse 4 A F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET X...

Страница 14: ...ibution box A1 Automatics Honeywell 4563B1011 F1 Fuse 4 A X1 0 Boiler s terminal plate Y1 Gas Valve Honeywell VR4601QB 2001 Z1 Anti interference element PS3 Minimal water level guard SP1 Minimal gas p...

Страница 15: ...ation electrode F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET BT1 safety...

Страница 16: ...lure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET X1 0 Boiler s terminal plate Y1 Gas Valve Honeywell VR4601QB 2001 Y2 Gas Valve Ho...

Страница 17: ...s Honeywell 4563B1011 F1 Fuse 4 A X1 0 Boiler s terminal plate Y1 Gas Valve Honeywell VR4601QB 2001 Y 2 Gas Valve Honeywell VR4605QB 2002 Z1 Anti interference element PS3 Minimal water level guard SP1...

Страница 18: ...onization electrode F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET BT1 sa...

Страница 19: ...voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET X1 0 Boiler s terminal plate Y1 Gas Valve Dungs MB ZRDLE 412B01S22...

Страница 20: ...A1 Automatics Honeywell 4563B1011 F1 Fuse 4 A X1 0 Boiler s terminal plate Y1 Gas Valve Dungs MB ZRDLE 412B01S22 Z1 Anti interference element PS3 Minimal water level guard SP1 Minimal gas pressure gu...

Страница 21: ...ization electrode F2 Fuse 2 5 A H1 Signalling Boiler under voltage H2 failure signalling H3 ionising failure signalling S1 Main power switch S2 Reduced rated output switch S3 Pushbutton RESET BT1 safe...

Страница 22: ...commendations for polyethylene MOP up to and including 10 bar EN 12007 3 Gas supply systems Pipelines for maximum operating pressure up to and including 16 bar Part 3 Specific functional recommendatio...

Страница 23: ...le both the pad and the bedding exceed the boiler ground plan on all sides by 15 mm 2 A safe distance from the flammable materials when installing and operating the boiler it is necessary to keep a sa...

Страница 24: ...es invalid The heating systems with an open expansion tank make possible a direct contact between the heating water and the atmosphere At the period of the heating season the water expanding in the ta...

Страница 25: ...the pilot burner In case that the ignition cycle has passed but the burner didn t catch fire there will light up the breakdown signalling on the network module see Fig no 18 If the ignition fails rep...

Страница 26: ...electromagnetic gas valves for the sizes with 10 12 and 15 sections Reduced output setting and adjusting 1 Put the boiler into operation 2 Measure the gas inlet pressure which must be between 15 and 2...

Страница 27: ...on the High Low coil 10 Check the combustion purity by using the combustion gases analyser NOx CO 7 3 3 Heat output setting and adjusting at the boiler equipped with Honeywell electromagnetic gas valv...

Страница 28: ...a way making sure that the required gas flow will be achieved 12 The gas flow at the reduced output can be adjusted by the regulation nut fig no 16 13 Check the combustion purity by using the combust...

Страница 29: ...ltage recovery in the electricity network the burner will start up automatically The failure is unblocked manually by means of unblocking pushbutton in the network module 7 Safety thermostat unblockin...

Страница 30: ...se will close the fuel supply to the boiler The fuse unblocking can be done by user by means of unblocking pushbutton TS A repeated boiler start can only be done after cooling down the combustion gase...

Страница 31: ...ount the cover draught diverters and the upper cover of the boiler shell put the boiler into operation During the boiler operation the agent reacts with the deposits and in form of combustion gases it...

Страница 32: ...onductors and or a faulty electrode Check the electrodes condition and the connection between ignition conductor and the earth wire 4 Boiler doesn t light up the ignition electrode is sparkling the fa...

Страница 33: ...he date it was dispatched from the manufacturing factory For boiler drum 5 years after the date its dispatch from the manufacturing factory For the validity of his guarantee the manufacturer requires...

Страница 34: ...unit EN 13429 2000 NO 3 1 Recovery by material recycling ensure recyclability in all term sof the standard for the functional packaging unit EN 13430 2000 YES 3 2 Recovery in the form of energy ensure...

Страница 35: ...35...

Страница 36: ...36 Date of revision 45 2012 ND GB...

Отзывы: