Introduction
13
Important:
The 5VSB power source of your power supply must support
≥
1A.
AC Power Failure Recovery
When power returns after an AC power failure, you may choose to
either power-on the system manually, let the system power-on
automatically or return to the state where you left off before power
failure occurs. Refer to PWR Lost Resume State in the Power
Management Setup section in chapter 3 for more information.
Virus Protection
Most viruses today destroy data stored in hard drives. The
mainboard is designed to protect the boot sector and partition
table of your hard disk drive.
1.2 Package Checklist
The mainboard package contains the following items:
þ
The mainboard
þ
A users manual
þ
One IDE cable for ATA/33, ATA/66 or ATA/100 IDE drives
þ
One 34-pin floppy disk drive cable
þ
One Main Board Utility CD
If any of these items are missing or damaged, please contact your
dealer or sales representative for assistance.