Installation Checklist
Perform the following checks listed below to ensure that all the necessary items are completed
before handing over to a commissioning engineer.
Table 7 - Installation Checklist
Site Name
Address
Detector Serial Number(s)
and Date of Manufacture
Interface Card Serial
Number & Date of
Manufacture
Name of Installer
Signature
Date
INSTALLATION CHECKS
Yes
No
1. Were the detector and the mounting bracket intact in the box?
2. Is the detector securely locked onto its mounting bracket? Note
that the two mounting bracket securing-screws are provided in a
separate bag with the detector.
3. Is the sampling air pipe firmly connected to the air inlet port?
Ensure the pipe is NOT glued.
4. Have the power wires been connected to the correct terminals on
the detector?
5. If required, has the end of line resistor been connected?
6. Have the alarm signalling wires been terminated to the correct
terminals of the detector?
7. Has the Interface card been correctly installed according to the
instructions provided (if applicable)?
8. Has the plug at the exhaust port been removed and the exhaust
pipe (if fitted) not glued?
9. Has the front cover been replaced correctly?
10.Has AutoLearn Flow and AutoLearn Smoke been performed?
Please state the AutoLearn Smoke period____________
11.Is the air sampling pipework installed and checked as per the site
plans?
Содержание LaserCOMPACT
Страница 2: ...LaserCOMPACT Product Guide VESDA 2 ...
Страница 5: ...VESDA LaserCOMPACT Product Guide iii FCC Class B EN 61000 6 3 EN 50130 4 Document 10280_04 ...
Страница 6: ...LaserCOMPACT Product Guide VESDA iv ...
Страница 20: ...LaserCOMPACT Product Guide VESDA 12 Product Dimensions Figure 7 Dimensions in mm inches for LaserCOMPACT ...
Страница 40: ...LaserCOMPACT Product Guide VESDA 32 ...