background image

3

ORIGINAL INSTRUCTIONS

VES Andover Ltd Eagle Close Chandlers Ford Ind. Est. Eastleigh Hampshire SO53 4NF
Tel: 023 8046 1150  Fax: 023 8026 1204  E-mail: [email protected] Web: www.ves.co.uk

    EVHR Hybrid Ventilation Unit

Installation, Operation and Maintenance Manual

Immediately upon receipt of goods, check for possible damage in transit paying particular
attention to fan impellers, coil connections and unit casing. Prior to installation please check to
ensure alignment and smooth rotation of the impeller after transit. Also check to ensure that
any ancillary items are included. These will normally be supplied fitted or, in the case of small
items, taped to the unit.
In the event of any damage having occurred or if any item is found to be missing, it is essential
to inform VES Andover Ltd. within 

7 days

 of delivery quoting sales order number and the unit

type, as found on the unit nameplate. After this period, VES is unable to accept any claim for
damaged or missing goods.

The entire system must be considered for safety purposes. It is the responsibility of the
installer to ensure that all of the equipment is installed in compliance with the manufacturer’s
recommendations, with due regard to the current HEALTH AND SAFETY AT WORK ACT and
conforms to all relevant statutory regulations.
Where a unit is installed such that component failure could result in injury to personnel,
precautions should be taken to prevent such an injury. If the unit is installed where there is a
reasonable possibility of persons or objects coming into contact with the impeller whilst
operational, a guard should be fitted or steps taken to prevent this. It is the installer’s
responsibility to ensure that access panels are not obstructed in any way. Safe working access
for maintenance must be provided in accordance with Health and Safety and Building
Regulations. For confirmation of required access please see the appropriate unit outline
drawing.
For safe maintenance, consideration must also be given by the installer for adequate
illumination of the unit location. Further consideration should be given to the unit’s position
and secured into place as appropriate, this should include lightning/surge protection as
appropriate.

Mounting hangers, door furniture, isolators etc. extend beyond the casework, so are vulnerable
to accidental damage. Take necessary precautions so as not to cause damage whilst handling
the unit.

The weight of each unit/section is specified on the outline drawing and the total unit weight will
be displayed on the unit inspection label. When lifting the unit using a fork lift truck ensure the
whole unit is supported by the full length of the forks. It may be necessary to use fork extensions
to fully support the unit. The centre of gravity may be offset from the centre of the unit; this
needs to be taken into consideration when lifting the unit.

Handle with care. Failure to fully support the unit during lifting may result in damage to the
unit casework

Fan sections are to be rigged and lifted using spreaders, taking
into account the weight of the unit. Lifting gear should be arranged
so as not to bear on the casework, see right.
The turret is supplied with lifting lugs which can be removed after
installation. Ensure that all fixings removed are replaced correctly.

Caution

Receipt of Goods

and Handling

Installation

3

Lifting Detail

Fig. 

2

4

Caution

Fork Lifting Detail

Fig. 

1

Содержание Ecovent EVHR

Страница 1: ...lectric current and high voltages Indicates hazards that require safety advice for personnel or potential unit property damage Indicates important information page Introduction 1 Nomenclature 2 Receip...

Страница 2: ...5 Fan Size 3 4 Sequential 6 Phase 1 230V 50Hz Single Phase 7 Main Heating Null No Heating W LPHW Coil E Electric Heater Battery 8 Main Filter Null No filter 9 Control Panel Section Null No Controls CP...

Страница 3: ...fitted or steps taken to prevent this It is the installer s responsibility to ensure that access panels are not obstructed in any way Safe working access for maintenance must be provided in accordance...

Страница 4: ...ontinued Ecovent EVHR units are designed to be mounted flush against the underside of the ceiling slab connected to a purpose made terminal or turret The connecting duct needs to be split so as to dif...

Страница 5: ...46 1150 Fax 023 8026 1204 E mail vesltd ves co uk Web www ves co uk EVHR Hybrid Ventilation Unit Installation Operation and Maintenance Manual Continued Installation 4 Key installation components Fan...

Страница 6: ...uded as part of the unit sealing only When moving assembled units ensure that ALL sections are fully supported Bracket Fixings Finishing Flange Moun ng Bracket Ecovent EVH units feature fresh air supp...

Страница 7: ...pendently supported by structural trimmers in accordance with local building regulations in order to protect plant weight and support any service personnel The EVHR turret is designed to be mounted ho...

Страница 8: ...W units are fitted with a coil temperature sensor as standard ensuring that boilers run continuously in low ambient temperatures can help to prevent this On Ecovent EVHR W units a Low Pressure Hot Wat...

Страница 9: ...ng care with the supply sensor cable separate the sections If rotating the coil section 90 reposition the coil section joing bracket to the next face as shown in fig 12 This bracket repositioning is n...

Страница 10: ...tions to match the required configurationas shown in fig 13 again take care with the sensor cable If at floor level this is eassiest to acheive by lifting and rotating the fan section Installation 4 C...

Страница 11: ...ough the building installation device and a dedicated isolated power supply with overload protection to account for motor start up currents Do not connect any unit to an electrical supply voltage outs...

Страница 12: ...Eastleigh Hampshire SO53 4NF Tel 023 8046 1150 Fax 023 8026 1204 E mail vesltd ves co uk Web www ves co uk EVHR Hybrid Ventilation Unit Installation Operation and Maintenance Manual Standard Wiring F...

Страница 13: ...t Eastleigh Hampshire SO53 4NF Tel 023 8046 1150 Fax 023 8026 1204 E mail vesltd ves co uk Web www ves co uk EVHR Hybrid Ventilation Unit Installation Operation and Maintenance Manual Standard Wiring...

Страница 14: ...Healthy indication will stop illuminating until the unit resumes normal operation The Open windows indication shall illuminate when the external temperature reaches a suitable level to encourage manu...

Страница 15: ...as the wind and elements may cause moving parts to windmill In general this series of units require little maintenance In the unlikely event of component failure spares are available from stock at VES...

Страница 16: ...using 4No M6 fixings To remove the fans ensure the unit is fully isolated and that any moving components have come to a halt Remove both side access panels Separate the connecting fan plug and socket...

Страница 17: ...be switched ON for minimum of two hours every month to remove any moisture that may have condensed within the motor The fan motors are maintenance free due to the use of ball bearings with life long...

Отзывы: