![Vertiv NetSure 801 AG1 Скачать руководство пользователя страница 76](http://html1.mh-extra.com/html/vertiv/netsure-801-ag1/netsure-801-ag1_user-manual_1008109076.webp)
Appendix 5 Schematic Diagram 70
NetSure 801 AG1 Power Supply System User Manual
Note:
1.The rectify cabinet and DC distribution cabinet must be staggered when they are parreled.
0V
-48V
0V
-48V
master rectify cabinet
slave rectify cabinet
rectify
rectify
0V
-48V
slave rectify cabinet
rectify
1.The max configuration of rectify cabinet is fixed 3 cabinets
parrel bus
parrel bus
AC terminal
AC terminal
AC terminal
0V
-48V
0V
-48V
master rectify cabinet
DC distribution cabinet
SMDU
PD1
SMDU
PD1
rectify
0V
-48V
slave rectify cabinet
SMDU
PD1
rectify
2.The type configuration of rectify cabinet and DC distribution cabinet is fixed 3 rectify cabinets and 2 DC distribution cabinets
CAN communication cable
CAN communication cable
parrel bus
parrel bus
AC terminal
AC terminal
0V
-48V
SMDU
PD1
0V
-48V
slave rectify cabinet
SMDU
PD1
rectify
AC terminal
DC distribution cabinet
AC input cable
AC input cable
AC input cable
AC input cable
AC input cable
AC input cable
PE bus
PE bus
PE bus
PE bus
PE bus
PE bus
PE bus
PE bus
PE cable
PE cable
CAN communication cable
CAN communication cable
SMDU
PD1
SMDU
PD1
SMDU
PD1
CAN communication cable
CAN communication cable
Figure 17 Schematic diagram of the Cabinet parallel connection