Chapter 3 Installation 33
NetSure 801 AG1 Power Supply System User Manual
Name of double-layer port
Pin No.
Pin name
Definition
J7
1
DO3_NC
NC contact of relay 3
2
DO4_NC
NC contact of relay 4
3
DO3_COM
Common contact of relay 3
4
DO4_COM
Common contact of relay 4
5
DO3_NO
NO contact of relay 3
6
DO4_NO
NO contact of relay 4
J8
1
DO5_NC
NC contact of relay 5
2
DO6_NC
NC contact of relay 6
3
DO5_COM
Common contact of relay 5
4
DO6_COM
Common contact of relay 6
5
DO5_NO
NO contact of relay 5
6
DO6_NO
NO contact of relay 6
J9
1
DO7_NC
NC contact of relay 7
2
DO8_NC
NC contact of relay 8
3
DO7_COM
Common contact of relay 7
4
DO8_COM
Common contact of relay 8
5
DO7_NO
NO contact of relay 7
6
DO8_NO
NO contact of relay 8
3.7 Installing Temperature Sensor
AD592BN temperature sensor is an option. The wiring steps are shown as follows:
1. Make cable connection to the temperature sensor. Pay attention to the cable definition and color.
2. Connect the P101-3 socket of the temperature sensor to J11 or J12 terminals of IB2 user connect board, the
positions of J11 and J12 is shown in Figure 3-24.The temperature sensor is shown in Figure 3-25.
Figure 3-25 Temperature sensor
3. The temperature probe should be put in the battery room where it can best incarnate the battery temperature.
When fixing it, do not connect it to any other exothermic equipment or metal conductor.