background image

Vertiv

| Liebert

®

 EXM

 EBC

 480V User Manual  |  

19

2.5

Batteries Approved for Use in Liebert EXM Systems

2.5.1

Floor Installation

If the Liebert EXM or battery cabinet is to be placed on a raised floor, the UPS should be mounted 
on a pedestal that will support the equipment point loading. Refer to the bottom view in 

Figures 13

 or

14

 to design this pedestal.

The mechanical stops are used to prevent the cabinet from rolling and should not be used for 
leveling or bearing the battery cabinet’s weight.

2.5.2 Cable Entry

Cables can enter the Liebert EXM, Liebert BDC and battery cabinets from the top or bottom 
through removable metal plates.
Some plates have factory-punched holes and others are designed to allow the personnel to 
punch holes for fitting and securing the conduit. Once the conduit holes are punched, these 
plates should be reattached to the UPS. The conduit size and wiring method must be in 
accordance with all local, regional and national codes and regulations, including NEC ANSI/NFPA 
70.

Table 3

Batteries approved for use in Liebert EXM External Battery Cabinet, 880mm

Supplier

Part Number

Weight, Single

Battery, lb. (kg)

EnerSys

12HX150E

26 (11.8)

12HX205

43 (19.5)

12HX300-FR

60 (27.2)

East Penn

U1HR1500

27 (12)

45HR2000

40 (18)

HR3000

61 (28)

C&D

UPS12-150MR

27.3 (12.4)

UPS12-210MR

40 (18)

 UPS12-300MR

58.4 (26.5)

Table 4

Batteries approved for use in Liebert EXM External Battery Cabinet, 1200mm

Supplier

Part Number

Weight, Single

Battery, lb. (kg)

EnerSys

12HX400-FR

80 (36.3)

12HX505-FR

103 (46.7)

12HX540-FR

106 (48.1)

East Penn

HR4000

80 (36)

31HR5000

98 (44)

HR5500

107 (49)

C&D

UPS12-350MR

 67.4 (30.5)

UPS12-400MR

75.8(34.4)

UPS12-490MR

100 (45)

UPS12-540MR

100 (45)

Содержание Liebert EXM 480V

Страница 1: ...Liebert EXM 480V External Battery Cabinet User Manual...

Страница 2: ...r damages resulting from use of this information or for any errors or omissions Refer to other local practices or building codes as applicable for the correct methods tools and materials to be used in...

Страница 3: ...12 2 2 1 Connected System 12 2 2 2 Stand Alone and Right Mounted Systems 12 2 2 3 Grounding 12 2 3 Control Connection 13 2 4 Non Standard Batteries 13 2 5 Batteries Approved for Use in Liebert EXM Sy...

Страница 4: ...ents 1200mm cabinet 27 Figure 15 Battery circuit breaker and UPS wiring with external batteries with two connecting wires31 TABLES Table 1 Control wiring for Liebert EXM to battery cabinet 9 Table 2 I...

Страница 5: ...prior to moving a battery cabinet after initial installation Battery cabinets contain non spillable batteries Keep units upright Do not stack Do not tilt Failure to heed this warning could result in...

Страница 6: ...ordance with federal state and local regulations Because lead is a toxic substance lead acid batteries must be recycled rather than discarded Do not dispose of battery or batteries in a fire The batte...

Страница 7: ...r ni percer les batteries car l lectrolyte qui s en coulerait est nocif pour la peau et les yeux Cet lectrolyte est toxique Lorsque vous travaillez avec des batteries prenez les pr cautions suivantes...

Страница 8: ...tion AVERTISSEMENT Le centre de gravit lev de l appareil pr sente un risque de renversement Une mauvaise manutention peut entra ner des dommages mat riels des blessures et m me la mort Faites preuve d...

Страница 9: ...electrician All power and control wiring must comply with all applicable national state and local codes One person should never work alone even if all power is disconnected from the equipment A secon...

Страница 10: ...ere are signs of damage do not proceed Call Vertiv at 1 800 542 2378 Report any damage to the shipper immediately Verify that the correct equipment is being installed The equipment supplied has an ide...

Страница 11: ...r maintenance and service Electrical codes require that the battery cabinet be installed with no less than 3 ft 1m of clearance at the front of the cabinet when operating No service clearance is requi...

Страница 12: ...aised floor it should be mounted on a pedestal suitably designed to accept the equipment point loading Refer to the base view to design this pedestal WARNING Risk of heavy unit falling over Improper h...

Страница 13: ...3 Remove the battery cabinet front panel to gain access to the busbars 4 Connect the safety ground and any necessary bonding ground cables to the copper ground busbar example UPS located behind the o...

Страница 14: ...ioned 6 Connect TB1 from battery cabinet to J22 on the UPS according to Table 1 Figure 2 Bolting the Liebert EXM Battery Cabinet to the Liebert EXM UPS NOTE The shunt trip drive capability for the bat...

Страница 15: ...ling for 50 250kVA UPS 50 250kVA Liebert eXM Battery Cabinet 1 Battery Cabinet 2 Battery Cabinet 3 Battery Cabinet 4 DC Input Busbar See Table 10 for power cable Battery cabinet placement is critical...

Страница 16: ...Regular maintenance of the battery module is an absolute necessity Periodic inspections of battery and terminal voltages specific gravity and connection resistance should be made Strictly follow the...

Страница 17: ...ed remove source of ground Contact with any part of a grounded battery can result in electrical shock Battery support tray must be used whenever a battery tray is being pulled out 2 1 1 Connecting the...

Страница 18: ...7 Control Wiring See Figure 9 and Table 1 for control wiring between the Liebert EXM Battery Cabinet and the Liebert EXM UPS See Figures 4 through 7 for battery cabinet terminal details 2 4 Non Stand...

Страница 19: ...ttery Battery Breaker 62 4 1585mm Alber BDSUi Optional LEFT SIDE Panel Removed RIGHT SIDE Panel Removed FRONT Door Removed 1 Control wiring and power wiring must be run in separate conduits 2 Vertiv r...

Страница 20: ...ces 0 56 14mm 6 Places 0 85 22mm 0 85 22mm Negative Busbar NEGATIVE AND POSITIVE BUSBARS Positive Busbar Negative Busbar Positive Busbar Ground Bus GROUND BUS Battery Breaker Alber BDSUi Optional LEFT...

Страница 21: ...See Detail A EXM46001 Rev 0 17 9 455mm 0 15 13mm 3 Typical 0 15 13mm 2 Typical 18 5 470mm 18 8 480mm 0 75 195mm Rectifier Input C Batt Batt Rectifier Input B Rectifier Input A Bypass Input A Output A...

Страница 22: ...tery Battery Bypass Input A Output A Output B Output C Bypass Input B Bypass Input C 1 Control wiring and power wiring must be run in separate conduits 2 All wiring must be in accordance with national...

Страница 23: ...punch holes for fitting and securing the conduit Once the conduit holes are punched these plates should be reattached to the UPS The conduit size and wiring method must be in accordance with all loca...

Страница 24: ...Block at J22 Refer to Figure 9 for circuit details Table 5 Battery cabinet interface J22 Pin Name Description 1 12V_DRV BCB driver signal 3 BCB STATUS BCB state signal 5 GND_DRY Dry ground 7 BCB_ON B...

Страница 25: ...le the recorded float voltage should be within the range shown If a discrepancy is found contact Vertiv Power Connections Check for corrosion and connection integrity Inspect wiring for discolored or...

Страница 26: ...Disconnect and insulate the cables connected to the battery Secure each battery shelf with retaining screws when maintenance is complete WARNING Risk of heavy unit tipping over while being moved Can c...

Страница 27: ...d and recycled or discarded in accordance with federal state and local regulations Because lead is a toxic substance lead acid batteries must be recycled rather than discarded Do not dispose of batter...

Страница 28: ...vinciaux et municipaux tant donn que le plomb est une substance toxique les batteries au plomb acide doivent tre recycl es plut t que mises au rebut Ne jetez jamais de batteries au feu car elles risqu...

Страница 29: ...pabilities include automatic internal DC resistance tests and trend analysis providing the ability to analyze performance and aid in troubleshooting The Alber BDSUi system is installed inside the batt...

Страница 30: ...wer Power connections for UXBM when a UXCM is connected to multiple strings Fiber Optic Communication with the UXBM 50 Power Switch Turns UXCM On and Off Input Power Receptacle Power cord connection a...

Страница 31: ...r control connection Charger control relay output for thermal runaway management Automatically shuts down charger when thermal runaway is detected RS 485 Connection Communication with optional accesso...

Страница 32: ...e UPS output L N and the fuse is rated at 8A See Figure 12 for the Alber BDSUi power wiring 2 10 Battery Protection 2 10 1 Battery Low Voltage Warning Before the end of discharge the Liebert EXM displ...

Страница 33: ...haust 36 914mm frtont access required for service 2 Keep cabinet within 15 degrees of vertical 3 Top and bottom cable entry available through removable access plates Remove punch to suit conduit size...

Страница 34: ...Vertiv Liebert EXM EBC 480V User Manual 30 Figure 14 Battery cabinet outline and main components 1200mm cabinet...

Страница 35: ...e access plates Remove punch to suit conduit size and replace 4 Control wiring and power wiring must be run in separate conduits 5 Copper cables only are recommended 6 All wiring must be in accordance...

Страница 36: ...70 C 74 F to 80 F 23 27 C for optimal battery life Operating Temperature Range F C 32 F to 104 F 0 to 40 C 74 F to 80 F 23 27 C for optimal battery life Relative Humidity up to 95 Non Condensing Oper...

Страница 37: ...04 HR4000 5429 31HR5000 3987 HR5500 5145 C D UPS12 150MR 2500 UPS12 210MR 3000 UPS12 300MR 3600 UPS12 350MR 4200 UPS12 400MR 5100 UPS12 490MR 5000 UPS12 540MR 5000 Table 12 Battery DC intermediate cir...

Страница 38: ...le 8 30 hr Boost charge mode inhibit also selectable End of Discharge 1 67 V cell selectable from 1 67 1 750V cell Battery Charge Operation Constant current and constant voltage charge mode Programmab...

Страница 39: ...k Protection Degree IEC 60529 IP20 finger proof with front doors open or closed Table 14 1200mm battery cabinet mechanical characteristics Rated Power kVA 50 250kVA Dimensions W x D x H in mm 34 645 x...

Страница 40: ...Vertiv Liebert EXM EBC 480V User Manual 36 Figure 15 Battery circuit breaker and UPS wiring with external batteries with two connecting wires U P S...

Страница 41: ...e log to record scheduled checks and any abnormal conditions The log should have space for all metered data including phase readings alarm messages UPS mode of operation air filter replacement date an...

Страница 42: ...cordance with federal state and local regulations Because lead is a toxic substance lead acid batteries must be recycled rather than discarded Do not dispose of battery or batteries in a fire The batt...

Страница 43: ...er pour l installation Les responsables de l entretien et l quipement d essai doivent reposer sur des tapis de caoutchouc lors de toute intervention sur une pi ce d quipement sous tension Les batterie...

Страница 44: ...turer s Web site for specific information about equalize charging AVERTISSEMENT Risque de d charge lectrique de r action explosive d incendie et d exposition des produits chimiques dangereux pouvant e...

Страница 45: ...1 3 HR3500 100 11 3 HR4000 100 11 3 31HR5000 100 11 3 HR5500 100 11 3 C D UPS12 150MR 30 3 4 UPS12 210MR 30 3 4 USP12 300MR 110 12 4 UPS12 350MR 110 12 4 UPS12 400MR 110 12 4 USP12 490MR 110 12 4 UPS1...

Страница 46: ...Vertiv Liebert EXM EBC 480V User Manual 42 NOTES...

Страница 47: ...Vertiv Liebert EXM EBC 480V User Manual 43...

Страница 48: ...Vertiv Liebert EXM EBC 480V User Manual 44...

Страница 49: ......

Страница 50: ...mes and logos referred to are trade names trademarks or registered trademarks of their respective owners While every precaution has been taken to ensure accuracy and completeness herein Vertiv Co assu...

Отзывы: