background image

FCC ID: K66VX-2R

Alignment

Vertex Standard Co., Ltd.

2

electrically from all other steps. Have all test equipment ready before beginning
and, follow all of the steps in a section in the order presented.

Required Test Equipment

  RF Signal Generator with calibrated output level at 500 MHz

  Deviation Meter (linear detector)

  In-line Wattmeter with 5% accuracy at 500 MHz

 50-

Ω

, 10-W RF Dummy Load

 8-

Ω

  AF Dummy Load

  Regulated DC Power Supply adjustable from 3 to 15 VDC, 2A

  Frequency Counter: 0.2-ppm accuracy at 500 MHz

  AF Signal Generator

 AC Voltmeter

  DC Voltmeter: high impedance

  VHF Sampling Coupler

 SINAD Meter

Alignment Preparation & Precautions

A 10-W RF load and in-line wattmeter must be connected to the main antenna

jack in all procedures that call for transmission, alignment is not possible with an
antenna. After completing one step, read the next step to see if the same test
equipment is required. If not, remove the test equipment (except dummy load and
wattmeter, if connected) before proceeding.

Correct alignment requires that the ambient temperature be the same as that of

the transceiver and test equipment, and that this temperature be held constant
between 20~30°C (68~86°F). When the transceiver is brought into the shop from hot
or cold air, it should be allowed some time to come to room temperature before
alignment. Whenever possible, alignments should be made with oscillator shields
and circuit boards firmly affixed in place. Also, the test equipment must be
thoroughly warmed up before beginning.

Note:

Signal levels in dB referred to in the alignment procedure are based on 0dBm=0.5

μ

V.

Содержание VX-2R

Страница 1: ...r Authorized Yaesu service technicians realign all circuits and make complete performance checks to ensure compliance with factory specifications after replacing any faulty components Those who do undertake any of the following alignments are cautioned to proceed at their own risk Problems caused by unauthorized attempts at realignment are not covered by the warranty policy Also Yaesu reserves the...

Страница 2: ... the main antenna jack in all procedures that call for transmission alignment is not possible with an antenna After completing one step read the next step to see if the same test equipment is required If not remove the test equipment except dummy load and wattmeter if connected before proceeding Correct alignment requires that the ambient temperature be the same as that of the transceiver and test...

Страница 3: ...in The display will show the first setting Note that the first few settings are not adjustable and are left as set from the factory In the alignment process each adjustment is selected by rotating the DIAL Alignment is performed by Pressing the V M button Injecting a signal of the required frequency and level then Pressing the V M button after a level setting or adjustment is made This second pres...

Страница 4: ...ust S9 Adjust the generator level to 20dBµ 1 kHz tone 3 5kHz deviation then press the V M button Rotate the DIAL to select the next setting Wide Low Scale S 1 Adjustment S1 Adjust the generator level to 0dBµ 1 kHz tone 20kHz deviation then press the V M button Rotate the DIAL to select the next setting Wide S Meter Full Scale Adjust S9 Adjust the generator level to 20dBµ 1 kHz tone 20kHz deviation...

Страница 5: ... button Rotate the DIAL to select the next setting Wide Low Scale S 1 Adjustment S1 Adjust the generator level to 0dBµ 1 kHz tone 20kHz deviation then press the V M button Rotate the DIAL to select the next setting Wide S Meter Full Scale Adjust S9 Adjust the generator level to 20dBµ 1 kHz tone 20kHz deviation then press the V M button Rotate the DIAL to select the next setting High TX Power Adjus...