Page
1
of
4
GENERAL WARRANTY CONDITIONS
1. The products issued by Vertex Life SL under any of its brands as of January 1, 2022 have the guarantee conditions provided
for in the transposition of European Union directives regarding contracts for the sale of goods and the supply of content or
digital services. Modification of the consolidated text of the General Law for the Defense of Consumers and Users and other
complementary laws, approved by Royal Legislative Decree 1/2007, of November 16, which have been carried out through
the approval of Royal Decree 7/ 2021 of April 27, and Royal Decree Law 24/2021, of November 2.
2. Vertex Life SL, in accordance with the aforementioned royal decrees, is liable to the user for any lack of conformity of its
products that manifest during the first three years from the date of acquisition of the good. In case of doubt about the date,
the date of purchase of the product reflected in the purchase invoice will prevail. Unless proven or evidence to the contrary,
it will be presumed that the lack of conformity of the product that is manifested in the first two years from that date, already
existed when the product was launched, except when for the goods this presumption is incompatible with its nature. or the
nature of the non-conformity.
3. In accordance with the standard, the consumer or user will cooperate with the manufacturer and its CENSAT after-sales
service to the extent reasonably possible and necessary to establish whether the cause of the lack of conformity is
attributable to a manufacturing defect or to other reasons. The obligation to cooperate will be limited to the technical means
available that are less intrusive for the consumer or user. When the consumer or user refuses to cooperate, the consumer
or user being here informed of this obligation of said requirement in a clear and understandable manner, the burden of
proof as to whether or not the lack of conformity existed at the time indicated in article 120, sections 1 or 2, as applicable,
will fall on the consumer or user.
4. For the guarantee to be effective, it will be essential that the user has complied with the installation and maintenance
obligations required in the Regulation of Technical Installations of Buildings (RITE) collected, among others, in articles 15 to
42. The most relevant aspects are mentioned here:
•
Article 15. Technical documentation for the design and dimensioning of thermal installations and Article 17
Technical
memory.
−
The thermal installations included in the scope of application of the RITE must be executed on the basis of
technical documentation that, depending on their importance,……..b) when the nominal thermal power to be
installed in the generation of heat or cold is greater or equal to 5 kW and less than or equal to 70 kW, the project
may be replaced by a technical report.
−
It will be prepared by an authorized installer, or by a competent qualified technician. The author of the technical
report will be responsible for the facility adapting to the requirements of well-being and hygiene, energy
efficiency and safety of the RITE and will act in coordination with the author of the general project of the
building.
•
Article 19. Generalities
−
Installations subject to this RITE will be carried out by authorized installation companies.
−
The execution of the thermal installations will be carried out subject to the project or technical report, as
appropriate, and will comply with current regulations and good practice standards.
−
The authorized installer or the director of the installation, when the participation of the latter is mandatory, will
verify the documentation provided by the suppliers of the equipment and materials that will deliver the
identification documents required by the mandatory provisions and by the project or report. technique.
•
Article 23. Installation certificate
−
Once the installation is complete, the commissioning tests of the installation specified in Technical Instruction 2
of this regulation have been carried out, with a satisfactory result, the authorized installer and the director of the
installation, when the participation of the latter is mandatory , will sign the installation certificate.
−
The certificate, according to the model established by the competent body of the Autonomous Community, will
have at least the following content: a) identification and data referring to its main technical characteristics of the
installation actually executed; b) Identification of the installation company, qualified installer with a professional
card and the director of the installation, when the participation of the latter is mandatory. c) the results of the
commissioning tests carried out in accordance with IT 2. d) express declaration that the installation has been
executed in accordance with the project or technical report and that it complies with the requirements
demanded by the RITE
•
Article 24. Commissioning of the installation
−
For the commissioning of thermal installations, both new plants and reforms of existing ones, referred to in
article 15.1.a) and b), it will be necessary to register the installation certificate in the competent body of the
Community Autonomous where the installation is located...
−
Once the documentation provided has been verified, the installation certificate will be registered by the
competent body of the Autonomous Community, and from this moment on, the installation will be put into
service.
Содержание COMPACT HIDRO 16
Страница 11: ...11 PUNTO DE CONEXIÓN DEL TERMOSTATO AMBIENTE ...
Страница 23: ...23 6 1 LIMPIEZA DE TUBOS DE LLAMA GAIA HIDRO 16 LEONORA HIDRO 24 COMPACT HIDRO 16 COMPACT HIDRO 24 EJEMPLO ...
Страница 32: ...USER MANUAL PELLETS STOVE HIDRO GAIA HIDRO 16 LEONORA HIDRO 24 COMPACT HIDRO 16 COMPACT HIDRO 24 EN ...
Страница 42: ...11 ROOM THERMOSTAT CONNECTION POINT ...
Страница 53: ...22 6 1 FLAME TUBES CLEANING GAIA HYDRO 16 LEONORA HYDRO 24 COMPACT HYDRO 16 COMPACT HYDRO 24 EXAMPLE ...
Страница 62: ...MANUAL DE USO SALAMANDRA DE PELLETS HIDRO GAIA HIDRO 16 LEONORA HIDRO 24 COMPACT HIDRO 16 COMPACT HIDRO 24 PT ...
Страница 72: ...11 PONTO DE CONEXÃO DO TERMÓSTATO DA SALA ...
Страница 84: ...23 6 1 LIMPEZA DOS TUBOS DE CHAMA GAIA HIDRO 16 LEONORA HIDRO 24 COMPACTO HIDRO 16 HIDRO COMPACTO 24 EXEMPLO ...
Страница 93: ...Página 4de 4 store eiderbiomasa com www eiderbiomass com ...