4/30
03/2016
Periodic general inspections, including an exam of the state of conservation and operating tests.
Tests for starting or restarting service in the event of changing the operation site, changing the configuration
or the conditions for use on the same site, following dismantlement and reassembly of the lifting machine,
after any considerable replacement, repair or transformation affecting the core components of the lifting
machine, following any accident caused by a failure in a core component of the lifting machine.
The tests must be performed in strict observance of protocol. They aim to provide preventive maintenance,
detecting any damage or faults that can create a risk.
VERLINDE provides an upkeep / maintenance manual for each piece of equipment. It is very important to make
sure that the individuals using the hoist are familiar with the equipment and its correct operation.
VERLINDE agencies are available and may, upon request or by contract, intervene and maintain the winch if
necessary.
If any replacement parts are needed, please specify the following information so that we may supply the
appropriate parts:
- the complete name of the winch
- the complete name of the hoisting motor if necessary
- the serial number of the winch
The 3 items above are listed on the ID plates attached to the winch, motors and on the inspection certificates.
For further information, please contact the winch manufacturer or the distributor.
Manufactured by :
Manufactured by:VERLINDE
VERNOUILLET- FRANCE
2, Boulevard de l'industrie
B.P. 59 28501 VERNOUILLET CEDEX
Phone: +33 (0)2.37.38.95.95
Fax: +33 (0)2.37.38.95.99
4
– Introduction to the machines
4.1 - General
These winches are designed for pulling or lifting loads from 1000 to 10000 kg.
Their FEM classification is 1 Am (ISO: M4)
The TVI Series winches are equipped with the following:
Reduction gear with planetary gears, completely watertight
.
Motor 1 speed, three-phase 230/400 V 50 Hz, protection rating IP 55. Operating limits from -10ºC to
+50ºC (without declassification).
24 V very-low voltage control including:
Contactors
Power line isolator
Thermal circuit breaker
Disconnectable button box (2 b emergency stop), 3 m of cable.
Содержание TVI Series
Страница 18: ...18 30 03 2016 11 Declaration of EC conformity...
Страница 19: ...19 30 03 2016 12 Appendixes A References of parts B Load limiter C Limit switch optional...
Страница 20: ...20 30 03 2016 A References of parts TVI 1T...
Страница 22: ...22 30 03 2016 TVI 2T 3T...
Страница 24: ...24 30 03 2016 TVI from 4T to 10T...