3
Locate the left rail, with the
L
at the front end. The
L
faces the left side wall of
the rack, not the center of the rack.
4
Guide the rail into the two holes in the one RU that you selected.
5
Hook the silver peg on the front of the rail into the top hole in the RU.
6
Snap the blue peg on the front of the rail into the bottom hole in the RU.
7
Repeat steps 3 to 6 for the rail on the right side of the rack.
8
Verify that both rails are parallel and fastened securely.
See “Installing the NetBackup appliance into a rack” on page 35.
Installing the NetBackup appliance into a rack
The appliance should be installed above any storage shelves. This configuration
allows proper weighting of the rack.
35
Installing hardware into racks
Installing the NetBackup appliance into a rack