Verine Midas HE Скачать руководство пользователя страница 37

Warning : Use only the coal or pebble fuel-bed supplied with the fire. When
replacing the coal or pebble fuel-bed remove the old coal or pebble fuel-bed
and discard it. Fit a complete coal or pebble fuel-bed from the manufacturer,
only use genuine replacements.

THE FOLLOWING STATEMENT IS APPLICABLE TO ALL FUEL-BED TYPES

This appliance uses fuel effect pieces containing Refractory Ceramic Fibres
(R.C.F.), which are man-made vitreous silicate fibres. Excessive exposure to
these materials may cause temporary irritation to eyes, skin and respiratory
tract. Consequently, it makes sense to take care when handling these
articles to ensure that the release of dust is kept to a minimum. To ensure
that the release of fibres from these R.C.F. articles is kept to a minimum,
during installation & servicing we recommend that you use a HEPA filtered
vacuum to remove any dust and soot accumulated in and around the fire,
before and after working on the fire. When replacing these articles we
recommend that the replaced items are not broken up, but are sealed within
a heavy duty polythene bag, clearly labelled as “RCF waste”. This is not
classified as “hazardous waste” and may be disposed of at a tipping site
licensed for the disposal of industrial waste. Protective clothing is not
required when handling these arrticles, but we do recommend you follow the
normal hygiene rules of not smoking, eating or drinking in the work area,
and always wash your hands before eating or drinking.

This appliance does not contain any component manufactured from
asbestos or asbestos related products.

5.6

Cleaning - WARNING

Before attempting any cleaning operation ensure that the fire has been allowed to
fully cool. The Brass fret that was supplied with the fire (dependent upon model
chosen) is real brass and therefore will discolour with use and should be cleaned
with a proprietory metal polish. The chrome & brass effect trims and chrome effect
fret that was supplied with the fire (dependent upon model chosen) should only be
cleaned with a clean, damp cloth.
The trim is best cleaned in position on the fire when the appliance is not running
and is cool. Black painted metal parts should be gently cleaned with a damp cloth.

To clean the glass panel, please remove it from the product as described on page
11. Use a clean damp cloth and ceramic glass cleaner to remove any stains or
deposits from the glass panel. Do not using scouring pads as this may scratch the
surface finish of the glass panel.

PLEASE NOTE :- The glass will require cleaning periodically. Condensation
produced by the products of combustion will create marks on the inside face of the
glass panel.

37

Содержание Midas HE

Страница 1: ...Installation Maintenance User Instructions Hand these instructions to the user Model No s NSHC MN NSHP MN NSHC SN NSHP SN are for use on Natural Gas G20 at a supply pressure of 20 mbar in G B I E den...

Страница 2: ...22 3 7 Lighting the appliance slide control models 23 3 8 Checking for clearance of combustion 24 products Section 4 Maintenance 4 1 Removal of the burner assembly manual control models 25 4 2 Removal...

Страница 3: ...15 5 kg Packed Weight All models with Contemporary Trim 13 5 kg Fire box Dimensions with trim fitted Width with trim fitted 510mm Height with trim fitted 625mm Depth from mounting face to rear panel...

Страница 4: ...Concrete Flue Blocks 8 I S 813 1996 Domestic Gas Installation Republic of Ireland No purpose made additional ventilation is normally required for this appliance when installed in G B When Installing...

Страница 5: ...over 150mm 1 5 FLUE CHIMNEY INSPECTION Before commencing installation a flue or chimney should be inspected to ensure that all the following conditions are satisfied 1 Check that the chimney flue only...

Страница 6: ...1 6 FIRE PLACE OPENING AND CHIMNEY CATCHMENT SPACE The front opening of the fire place must be between 330 and 440 mm wide and between 550 and 575mm high If the opening exceeds these dimensions then...

Страница 7: ...h mm Minimum Depth Required mm 330 minimum opening width 152 340 149 350 146 360 144 370 142 380 139 390 137 400 135 410 132 420 130 430 127 440 maximum opening width 125 For example if the appliance...

Страница 8: ...t depth To increase this depth the fire surround may be packed away from the wall using suitable non combustible board providing the installation is correctly sealed If in doubt about the suitability...

Страница 9: ...fitted with an atmosphere sensing spillage monitoring system in the form of an oxygen sensing burner This is designed to shut the fire off in the event of a partial or complete blockage of the flue c...

Страница 10: ...urner assembly 1 off Boxed ceramic pebble effect fuel bed 1 off Loose items bag 1 off Chrome Effect Trim Ashpan 1 off Installation User book Combined 2 2 INSTALLING THE FIRE BOX Establish which type o...

Страница 11: ...ition by 3 screws as shown below in Fig 3 c Remove the right hand glass retaining trim as which is held in position by 3 screws as shown below in Fig 3 d Remove the burner heat shield which is held in...

Страница 12: ...Remove the two screws at the bottom of the control panel See fig 4 below Remove the three screws from the fuel bed base support as shown below also in Fig 4 Fig 4 f Lift the burner engine clear as sh...

Страница 13: ...he aluminium operating arm and pull the cable out from its fixing hole Release the other end of the cable by pushing the cable forwards to the right i e into the operating arm so as to release the ten...

Страница 14: ...d plan the pipe run to enter the fire box through one of the openings in the sides or rear of the fire box below the fuelbed support panel and connect to the isolating inlet elbow The gas connection t...

Страница 15: ...a blunt chisel remove the inlet aperture selected and then seal with the grommet supplied To provide access for the gas supply pipe cut the grommet with a sharp knife Failure to seal the inlet apertu...

Страница 16: ...ngs not provided To fit using the preferred cable method proceed as follows k Mark out and drill 4 off No 14 7mm holes in the back face of the fire opening in the positions shown below in fig 11 Fig 1...

Страница 17: ...fig 12 below Fig 12 p Evenly tighten the tensioning nuts to tension both cables and pull the fire snugly against the wall Do not overtighten it is only necessary to pull the seal up against the sealin...

Страница 18: ...it a manometer b Turn on the main gas supply and carry out a gas tightness test c Depress the control knob and turn anti clockwise to the position marked ignition low Hold in the control knob for a fe...

Страница 19: ...the control lever for a few seconds to purge the pipe work The burner should light continue to hold the control lever for a few seconds to latch the valve then lift to the full on position d Check tha...

Страница 20: ...e boards Make sure that the fuelbed base is located centrally in the fire box See Fig 14 below Fig 14 3 2 Fitting the Pebble Fuelbed where applicable a Place the pebble fuelbed centrally on to the fue...

Страница 21: ...these articles we rec ommend that the replaced items are not broken up but are sealed within a heavy duty polythene bag clearly labelled as RCF waste This is not classified as hazardous waste and may...

Страница 22: ...button until ignition occurs Continue to hold the control knob for a minimum of 20 seconds to allow the thermocouple to heat up if the burner goes out when the control knob is released repeat the ligh...

Страница 23: ...pilot goes out when the control lever is released repeat the lighting sequence c After lighting move control lever up to the high position and the main burner will light It is recommended that for the...

Страница 24: ...cooled d If spillage persists the flue is not functioning correctly and a fault exists If after investigation the fault cannot be traced and rectified the fire must be disconnected from the gas supply...

Страница 25: ...c 4 1 2 Remove the trim Remove the fret ash pan cover or contemporary trim out of the way and put them in a safe location Remove the top left and right glass trim retaining screws Lift the glass panel...

Страница 26: ...ntrol tap locknut from the front of the control panel and remove the control tap 4 3 5 To refit a control tap reassemble in reverse order noting that the control tap locates with a flat in the control...

Страница 27: ...f the retaining hole and remove the cable through the slot in the operating arm Remove the two retaining screws at the base of the burner unit and the screw each side of the burner unit The base of th...

Страница 28: ...ng cap situated at the front right of the fire and remove the battery 4 7 2 Replace in the reverse order using a 1 5V AA Alkaline Battery 4 8 Removing the Oxy Pilot Assembly SC models Note Because thi...

Страница 29: ...e new cable into the long length of p t f e sleeve as supplied taking care not to kink the sleeve Now carefully feed the sleeve and cable into the left hand cable guide tube until the ends emerge abov...

Страница 30: ...the left hand micro switch operates the igniter and that the control valve spindle is fully depressed Move the control lever upwards to the off position and check that the right hand cut off micro sw...

Страница 31: ...xcess of 150mm No purpose made additional ventilation is normally required for this appliance when installed in G B When installed I E please consult document I S 813 1996 Domestic Gas Installation wh...

Страница 32: ...appliance is serviced at least once a year by a GAS SAFE registered gas installer and that during the service the fire is removed from the fire opening and the chimney or flue visually checked for fal...

Страница 33: ...the control knob in for a minimum of 20 seconds to allow the thermocouple to heat up if the burner goes out when the control knob is released repeat the lighting sequence In the unlikely event of a f...

Страница 34: ...does not light continue to press the control lever until ignition occurs The pilot flame can be seen by looking to the left hand side of the burner unit When the pilot has lit continue to hold the co...

Страница 35: ...tion to give the desired heat output The lever can be set at a position between the ignition and low position but this will provide only a glow from the fuel bed and not visible flames See Fig 1 on pr...

Страница 36: ...d centrally in the fire box See Fig 2 below Replace the glass panel and trims in reverse order Fig 2 5 5 Removal Replacement of the Pebble Fuelbed where applicable a Remove the trim fret or fascia as...

Страница 37: ...of industrial waste Protective clothing is not required when handling these arrticles but we do recommend you follow the normal hygiene rules of not smoking eating or drinking in the work area and al...

Страница 38: ...move the fret ashpan cover from the packaging b Place fret up to the front radiused section of the fuelbed taking care not to move coal positions c Place ashpan cover under fret assembly and centralis...

Страница 39: ...the exact accuracy of descriptions and illustrations cannot be guaranteed Part no B 131080 Issue 5 BFM Europe Ltd Trentham Lakes Stoke on Trent Staffordshire ST4 4TJ www bfm europe com Telephone Gene...

Отзывы: