Verine Marcello NBFP00RN Скачать руководство пользователя страница 7

 

the  wall  using  screws  and  wall  plugs.  Make  sure  the  plate  is  fixed  the  correct 
way up. (See Figure 3) Slide the flue further into the wall until the tabs on the 
wall plate line up with the holes in the outer flue tube.  Temporally fix the tube 
to  the  wall  plate  with  the  self  tapping  screws  provided.  Use  the  inner  holes  as 
shown in Figure 4. 

 

 

 

 

 

 

On  the  inside  wall  centre  and  level  the  convector  box  over  the  protruding  flue 
pipe.  Once  level,  fix  the  convector  box  to  the  wall  with  four  screws  and  wall 
plugs.    The  convector  box  has  been  designed  to  ensure  an  air  gap  remains 
between  the  wall  and  the  back  of  the  convector  box.    Consideration  should  be 
given to ensure this gap is achieved and not affected by uneven wall surfaces. 

From  the  inside  of  the  convector  box  measure  inwards  along  the  flue  6mm.  At 
this  point  draw  a  line  completely  around  the  outer  pipe.  Unscrew  the  self 
tapping  screws  securing  the  outer  flue  tube  to  the  wall  plate  and  withdraw  the 
flue  assembly.  Move  the  polystyrene  support  ring  inside  the  flue  assembly  to  a 
position near the marked line. Cut the excess flue of at the marked line. De-bur 
the cut edges and remove the polystyrene ring.  

Slide  the  remaining  piece  of  flue,  which  should  include  the  terminal,  on  to  the 
flue connection on the back of the heat exchanger. Note that the two flue tubes 
are  not  concentric  and  that  the  inner  tube  is  positioned  towards  the  top  of  the 
outer  tube.    Using  a  3.5mm  diameter  drill,  drill  holes  through  the  holes  in  the 
flue  outer  ring  and  into  the  outer  flue  tube.  Secure  in  place  with  self  tapping 
screws  and  then  cover  and  seal  the  joint  with  the  length  of  aluminium  tape 
supplied. Thread the fibreglass rope ring sealing gasket on to the flue. 

The  gas  supply  should  be  routed  from  the  meter  or  cylinder  to  a  point 
underneath  or  behind  the  appliance.  There  are  two  grommeted  apertures 
provided  for  gas  pipe  entry  in  the  convector  box.  From  this  point  route  the 
supply in 8mm diameter tubing to the combined pressure test point and isolator 
fitting. Any exposed pipe within the wall cavity should be wrapped, painted with 
bituminous paint or factory sheathed. Prior to connecting the burner to the gas 
supply it is advisable to blow out the pipe to clear any dirt that may be present 
and which could cause a blockage in the control valve or pilot.  

Lift  the  heat  exchanger  and  flue  assembly  and  slide  the  flue  assembly  through 
the  hole  in  the  wall  until  the  heat  exchanger  flange  meets  the  convector  box 
flange. Fix the heat exchanger to the convector box using the M5 nuts and bolts 
supplied. Replace the self tapping screws that secured the flue to the wall plate. 
Seal the flue to the wall plate with mastic. Fit the terminal guard centrally over 
the terminal using screws and wall plugs. 

If  plasterwork  requires  to  be  made  good,  please  pay  attention  to  note  no.  3  on 

Figure 4 

Содержание Marcello NBFP00RN

Страница 1: ...ced Flue Convector MODEL NUMBERS NBFP00RN NBFP00RP INSTALLATION USER AND SERVICING INSTRUCTIONS THESE INSTRUCTIONS MUST REMAIN WITH THE USER THIS APPLIANCE MEETS THE REQUIREMENTS OF THE EUROPEAN GAS D...

Страница 2: ...ourself product and it must be installed by a competent person 2 The Installation Instructions must be adhered to without exception 3 The heat from this appliance will cause the wall directly above th...

Страница 3: ...lations APPLIANCE DATA NBFP00RN NBFP00RP GAS TYPE NATURAL GAS PROPANE SUPPLY PRESSURE 20mb 37mb HEAT INPUT 4 5 kW Gross 4 25kW Gross GAS RATE 0 43m 3 h 0 16 m 3 h 305g hr INJECTOR SIZE 1 6 mm 1 05 mm...

Страница 4: ...structions and ventilation openings are shown below DIMENSION TERMINAL POSITION MINIMUM DISTANCE A Directly below an opening air brick or window etc 300mm B Above an opening air brick opening windows...

Страница 5: ...earth shall a Extend through the whole base of the builders opening fireplace recess or beneath the flue box b Project at least 275mm in front of the glass window panel c Project at least 150mm beyond...

Страница 6: ...the dwelling Fitting This appliance can be installed either by being fixed directly on to the surface or it can be inset into the inner leaf of a cavity wall Before starting the installation remove th...

Страница 7: ...are not concentric and that the inner tube is positioned towards the top of the outer tube Using a 3 5mm diameter drill drill holes through the holes in the flue outer ring and into the outer flue tu...

Страница 8: ...porally screw the convector box to the inner wall plate with four M5 screws Place the convector box over the protruding flue pipe and push the box into the hole already cut in the inner leaf of the ca...

Страница 9: ...tor box flange Fix the heat exchanger through the convector box flanges to the inner fascia using the M5 bolts supplied Replace the self tapping screws that secure the flue to the wall plate Seal the...

Страница 10: ...the gas supply must be turned on by removing the cap from the isolator fitting and unscrewing the plug all the way out Replace the cap making sure that the tab engages with the slot in the top of the...

Страница 11: ...11 4 Advise the importance of having the appliance serviced on an annual basis...

Страница 12: ...results from your fire we recommend that it be serviced annually 7 These instructions are provided to assist you to operate the fire correctly and should be kept in a safe place 8 If you have any reas...

Страница 13: ...ger period d Depress control knob A slightly and turn anti clockwise to the ON position The main burner will not operate until this is done The main burner may light depending on the position of Contr...

Страница 14: ...the DOWN button on the handset Release when the flame is at the desired height or has gone out Once again the electric motor should be heard moving Control Knob B Cleaning the fire Ensure that the app...

Страница 15: ...eating or drinking in the work area and that hands are washed before eating or drinking The appliance should be serviced at least once a year by a CORGI registered engineer This is the basic procedure...

Страница 16: ...it and secure with the eight nuts Tighten the nuts evenly Stubborn marks can be removed with steel wool and detergent AFTER REFITTING THE APPLIANCE CHECK FOR GAS SOUNDNESS AT ALL GAS JOINTS 12 Replac...

Страница 17: ...placement the parts list is as follows Part Description Part Number Motorised valve CV 104103 Remote hand control Receiver CV 104413 Pilot Burner NG Model CV 104506 Pilot Burner LPG Model CV 104513 In...

Страница 18: ...3rd SERVICE Serviced by CORGI No Service Date Signed Comments RECORD OF 4th SERVICE Serviced by CORGI No Service Date Signed Comments RECORD OF 5th SERVICE Serviced by CORGI No Service Date Signed Com...

Страница 19: ...19 B 111770 Issue 2 BFM Europe Limited Trentham Lakes Stoke on Trent Staffordshire ST4 4TJ Tel 01782 339000 Fax 01782 339009 Email info bfm europe com www bfm europe com...

Отзывы: