![VERDER Carbolite Gero CSR Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/verder/carbolite-gero-csr/carbolite-gero-csr_installation-and-operation-instructions-manual_1003718021.webp)
9.2
Commissioning - Initial Function Checks
When the product has been connected to the mains electrical
supply, check the following:
Checked
by:
Power Switch
Check that when turned to the ON position, the
instrumentation on the control cabinet illuminates.
Safety Switch
Check that the power to the rotation system is switched
off when the guard is opened.
Rotation
System
Check that all moving parts are sufficiently lubricated, and
that they move freely without obstruction.
21
Содержание Carbolite Gero CSR
Страница 19: ...8 0 Controller Please refer to the separate controller manual s provided 19 ...
Страница 30: ......
Страница 31: ...Notes Service Record Engineer Name Date Record of Work ...