![VERDER Carbolite Gero CSR Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/verder/carbolite-gero-csr/carbolite-gero-csr_installation-and-operation-instructions-manual_1003718015.webp)
7.0
Installation
7.1
Manual Handling
Refer to section 4.0 of this manual for product dimensions.
Mechanical lifting equipment may be necessary!
Consult personnel responsible for health and safety before attempting
to move this product!
It is the responsibility of the customer to provide any mechanical
lifting aids, such as pallet trucks, forklifts or cranes, and to ensure that
all operators of such equipment are fully trained and qualified.
All manual handling must be carried out according to local health and
safety guidelines.
Note:
The customer is responsible for all manual handling procedures performed on
their own premises.
7.2
Unpacking
Note:
Check that all items intended for delivery are present and undamaged before
proceeding to install the product.
For safety and manoeuvrability, the product is delivered secured to a pallet inside a
crate.
It is advised that the product is left on the pallet until it has been moved as close as
possible to its intended installation location.
l
Using the appropriate tools, carefully open the crate and remove all external pack-
aging. Retain the crate panels and packaging.
l
Ensuring that the product is stable and secure, remove any straps retaining the
product to the pallet.
l
Use appropriate lifting equipment to lift the unit from underneath the base.
l
Manoeuvre the product into the desired position, ensuring that there is sufficient
clearance above and around the sides of the furnace body.
15
Содержание Carbolite Gero CSR
Страница 19: ...8 0 Controller Please refer to the separate controller manual s provided 19 ...
Страница 30: ......
Страница 31: ...Notes Service Record Engineer Name Date Record of Work ...