1779-160404(2)
Drukfouten, fouten en technische wijzigingen voorbehouden.
INSTALLATION MANUAL
VERANDA V920 - RIVA
10399-191126EN
7
Subject to misprints, errors and technical modifications.
drilling
line
x nr. of beams
D
300 mm
Seal round the edge
before and after mounting
Seal round the edge
before and after mounting
Foundation
block
16
Foundation
hole
E
5
19
21
20
65 mm
18
17
6
330 mm
A
E
D
F
14
15
B (x6)
drilling
line
x nr. of beams
D
300 mm
Seal round the edge
before and after mounting
Seal round the edge
before and after mounting
Foundation
block
16
Foundation
hole
E
5
19
21
20
65 mm
18
17
6
330 mm
A
E
D
F
14
15
B (x6)
drilling
line
x nr. of beams
D
300 mm
Seal round the edge
before and after mounting
Seal round the edge
before and after mounting
Foundation
block
16
Foundation
hole
E
5
19
21
20
65 mm
18
17
6
330 mm
A
E
D
F
14
15
B (x6)
Coupling Post/gutter (2x)
Side plates gutter profile (15) (2x) and T connectors (14) (x nr. of beams).
7
8
3.
Gutter and Post
drilling
line
x nr. of beams
D
300 mm
Seal round the edge
before and after mounting
Seal round the edge
before and after mounting
Foundation
block
16
Foundation
hole
E
5
19
21
20
65 mm
18
17
6
330 mm
A
E
D
F
14
15
B (x6)
drilling
line
x nr. of beams
D
300 mm
Seal round the edge
before and after mounting
Seal round the edge
before and after mounting
Foundation
block
16
Foundation
hole
E
5
19
21
20
65 mm
18
17
6
330 mm
A
E
D
F
14
15
B (x6)
drilling
line
x nr. of beams
D
300 mm
Seal round the edge
before and after mounting
Seal round the edge
before and after mounting
Foundation
block
16
Foundation
hole
E
5
19
21
20
65 mm
18
17
6
330 mm
A
E
D
F
14
15
B (x6)
drilling
line
x nr. of beams
D
300 mm
Seal round the edge
before and after mounting
Seal round the edge
before and after mounting
Foundation
block
16
Foundation
hole
E
5
19
21
20
65 mm
18
17
6
330 mm
A
E
D
F
14
15
B (x6)
Drainage
•
First measure the position of the center hole, then drill on the drilling line on the inside of the gutter.
• Drill a 48 mm hole on the outside of the gutter.
•
Fix in the waste duct and nut (20 + 21) and the leaf catcher (19).
6
drilling
line
x nr. of beams
D
300 mm
Seal round the edge
before and after mounting
Seal round the edge
before and after mounting
Foundation
block
16
Foundation
hole
E
5
19
21
20
65 mm
18
17
6
330 mm
A
E
D
F
14
15
B (x6)
Содержание RIVA V920
Страница 1: ...INSTALLATION MANUAL VERANDA V920 RIVA...