SUPERCEDES
TITLE
DATE
SECTION
CINCINNATI, OHIO
MFG., INC.
CRANE OPERATION AND MAINTENANCE INSTRUCTIONS
HT25KX
SAFETY
Before operating this crane, read and understand these instructions, the 920612 Crane Safety and
Hazards Information Sheet, and review all safety & instruction labels on the crane.
CRANE INSPECTION
Before operating this crane, inspect for wear, damage, or oil leakage. After the wire rope has been run
out, check for wear, kinks, and broken strands. Check the hook and safety latch for damage. Correct
any problems before using the crane.
CAPACITY
Before operating this crane, review the capacity charts on the sides of the boom to relate the load to be
lifted to the boom length and angle. The boom angle is shown by a gravity arrow.
SNATCH BLOCK
If the load exceeds 2500 lbs. or reduced winching speed for better control of smaller loads is required,
use the snatch block to rig the crane for two part line operation.
CONTROLS
This crane is operated by a remote control pendant. The pendant should be unplugged and stored in a
compartment when the crane is not in use.
Before plugging the pendant in, inspect the plug, socket, cord, pendant head, and switches for damage.
Actuate all four switches both ways to verify that they all have the same feel and sound and that they
return to the center position.
PTO SYSTEM
Check the hydraulic fluid level in the PTO system reservoir. Engage PTO and set the engine idle speed
to provide a hydraulic flow rate per the PTO system instructions. A lower idle setting may be used for
more delicate spotting of loads if required.
CRANE OPERATION
Use "Winch Down" to release tension on the wire rope to unhook it from the storage tie down position.
Use "Boom Up" to elevate the boom from the boom rest position.
Avoid repeated rapid reversals of the control switches. This can cause the load to swing.
Check all control functions to see that they are working as described in the following section
CONTROL FUNCTIONS
WINCH "UP" and "DOWN" - Raises and lowers the load with the winch.
BOOM "UP" and "DOWN" - Raises and lowers the boom elevation angle. The boom elevates from 8
degrees below horizontal to 75 degrees above horizontal.
BOOM "OUT" and "IN" - Extends and retracts the boom. The boom hydraulic extension stroke is 6 ft.
20435A
C200
-
6-17-02
INSTALLATION DWG
HT25KX
Содержание HT25KX
Страница 1: ......
Страница 2: ......
Страница 4: ......
Страница 5: ...SECTION 100 DESCRIPTION SPECIFICATIONS 7607100A...
Страница 8: ......
Страница 11: ...SECTION 150 SAFETY 8604150...
Страница 16: ...SECTION 200 INSTALLATION 7607200A...
Страница 22: ...OUT IN P B...
Страница 23: ......
Страница 25: ......
Страница 29: ...SECTION 300 MAINTENANCE SERVICE 7607300A...
Страница 31: ...SECTION 400 PARTS 7607400A...
Страница 32: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......