Do not start the central until all the ducts are all completely fitted (Air 

inlet, retaining grille or roof outlet, supply and extraction outlets, ducts 

and filters fitted)

and filters fitted) 

When started, the central IDEO automatically adapts to the specific 

characteristics of each installation. If any component is missing or badly 

fitted, normal operation may be impaired. 

H05VV-F-5G1 type cable

Length 1.2 m

Connection box

Electrical panel

Power supply:
Single phase 230VAC-50Hz
Electrical protection:
3 A 
Maximum power:
190 Watts

190 Watts
Max. ambient temperature:
50º C
Max. temperature of flows:
45º C

2.5

Characteristics and electrical connections

Connect the supplied cable to the mains, using a hermetic connection box. 

Содержание IDEO - 275 Ecowatt

Страница 1: ...CTB IDEO 275 Ecowatt Installation Manual...

Страница 2: ...Before manipulating this device disconnect the electricity supply During normal operation never stop the ventilation system...

Страница 3: ...homes Soler Palau will not be held liable for damage produced by Misuse Normal wear and tear of components Non observance of the instructions contained in this manual regarding safety use and start up...

Страница 4: ...ed airflows are separated and filtered Only the energy from the extracted air is transferred to the new fresh air introduced Thanks to IDEO 275 Ecowatt s high efficiency heat exchanger performance can...

Страница 5: ...avoid thermal losses and optimise the performance of the installation it is d d t i l t d t b f i th i recommended to use insulated tubes for moving the warm air Discharge extracted air to outside Th...

Страница 6: ...2 3 Dimensions Central unit Weight 51 Kg Remote controls Programmable module Kitchen boost...

Страница 7: ...Wall bracket 2 4 Placement On a vertical wall On the floor It is recommended to locate IDEO in heated house space Otherwise it will be necessary to insulate the condensate drain pipework...

Страница 8: ...fic kit option Support It is recommended to locate IDEO in heated house space Otherwise it will be necessary to insulate the condensate drain pipework necessary to insulate the condensate drain pipewo...

Страница 9: ...Y Kitchen Outlet roof caps CT 150 Toilets BDOP 125 BDOP 80 Toilets Air intake plenum PAP Air intake D150 Li i itti Or PAF 150 Circular Air intake wall hoods Living sitting room Bedrooms Or Or PAST Air...

Страница 10: ...TYPE DISTRIBUTION Outlet roof caps CT 150 Living sitting room BDOP 125 Kitchen BDOP 125 BDOP D80 RD80 Bedrooms Toilets BAR Toilets PAP Air intake D150mm BDOP D80 RD80 Or PAF 150 Circular Air intake D...

Страница 11: ...aracteristics of each installation If any component is missing or badly fitted normal operation may be impaired H05VV F 5G1 type cable Length 1 2 m Connection box Electrical panel Power supply Single...

Страница 12: ...type battery The programming module is located on the front of the machine This remote control can also be located on a wall The programming module is located on the front of the machine This remote c...

Страница 13: ...or large flow 6 By pass 7 Defrost mode 7 Defrost mode 8 Absence mode 9 Transmission reception level 10 Battery level 11 Default mode 12 Change filter 12 Change filter 13 Instant energy saving 14 Energ...

Страница 14: ...alidate with key 18 Validate with key 18 The pictogram with two fans will flash Validate with key 18 Adjust the maximum desired flow using keys 19 and 20 in 5 m3 h steps according to the configuration...

Страница 15: ...ass Select with key 18 Select ON using keys 19 or 20 Validate with key 18 You can disable the forced by pass mode at any time To do this Navigate with keys 19 or 20 to pictogram 6 showing the By pass...

Страница 16: ...played 11 This icon is displayed when one of the components is out of service motor probe This icon is displayed when one of the components is out of service motor probe sensor Or if the IDEO detects...

Отзывы: