Allow the heat recovery core to soak for three

hours in warm water  and mild soap. Rinse under a
heavy stream of water.

Fans

Blower wheels and fan housing should be checked

for dirt build-up. If they appear dirty, it may be 
necessary to remove the blower assembly and then
vacuum the dust out through the fan mouth. See the
following page for instructions on removing the
blower assembly.

System Operation Check

Verification of all control modes should be 

checked to ensure proper operation. Refer to the
Controls Section, Sequence of Operation.

Testing and Replacement of the Damper Actuator

Check damper operation by switching between

LOW - COM or HIGH - COM on the dry contact 
terminal or by switching through the modes on the
optional remote wall control. If the damper does not
respond in one or both directions, check all connections.

700 cfm ONLY:

Check for 24 volt output between the

White/Red and the White/Orange wires at the damper
motor. If 24 volts can be measured at the damper
motor, the problem is either in the connections, the
defrost relay or the main circuit board.

600/1200 cfm ONLY: 

(

CAUTION: 

120VAC) Check

for 120 volt output across the White/Black wires. If
120 volt can be measured at the motor, replace the
motor. If 120 volt cannot be measured at the motor,
check pins J1-9 at the printed circuit board.

Main Circuit Board Replacement

The main circuit board must be replaced if an 

electronic problem arises. For example, the unit 
suddenly stops, the unit stays in defrost all of the
time or if control functions are not working properly.

Ensure that power is reaching the board. Test the

blower motors and damper actuators for operation
when directly connected to the appropriate power
voltage. If the motor and damper actuators function 
normally, replace the main circuit board.

Motor and Blower Removal and Installation

Disconnect power from the unit. To determine if

the fan motor is burned out, disconnect the four-wire
service connector between the motor and cabinet.
Connect the motor directly to a 115 volt power
source with an electrical cable, as follows:

If the motor functions normally, there is a problem

with the wiring connections or the main circuit
board. Check all wiring and replace main circuit
board if necessary.

If the blower does not run, it must be replaced. To

replace the motor, remove the heat recovery core
from the unit. Disconnect the four-wire service connector
from the unit. Remove the fasteners holding the
motor assembly in place. Lift the assembly up and
out, using one hand under the motor and one hand to
steady it. Remove the assembly carefully from the
unit to avoid damage to the insulation, shelf, etc.
Install the repaired motor assembly by following
these instructions in reverse.

600 cfm and 1200 cfm

700 cfm

RED + WHITE

Low speed

BLUE + WHITE

Medium speed

BLACK + WHITE

High speed

REMOVE THESE
 2 SCREWS

LOCKING PLATE

CAPACITOR

VD0004A

SERVICE CONNECTOR

THUMBSCREW

VD0001A

WARNING

Hot water and a strong cleaning agent could 
damage the polypropylene core. Ensure the core is
returned to the unit in the correct orientation. Use
the sticker as a guide.

Содержание 1200 cfm

Страница 1: ...Light Commercial Heat Recovery Ventilators VB0002 VB0003 VB0001 600 cfm 700 cfm 1200 cfm Installation Operation and Service Instructions 06 00 04597...

Страница 2: ...5 3 4 Remote Wall Control Optional 6 4 Airflow Measurement and Balancing 6 4 1 Flow Station Positions 6 4 2 Balancing Procedure 7 5 Maintenance and Service 7 5 1 Bi Monthly Maintenance 7 5 2 Annual M...

Страница 3: ...also be easily accessible for maintenance 2 3 Mounting Options There are several options for hanging or floor mounting the unit NOTE In all cases the unit must be level Consult local building code fo...

Страница 4: ...at every grille and diffuser location to make balancing of the system possible A proper selection of style and size of grilles and diffusers is required to minimize pressure drop The velocity of the a...

Страница 5: ...creating a closure across LOW COM or high speed can be initiated by creating a closure across HIGH COM Unit Check points ___ Power connected no ventilation call Both fans are off defrost damper if eq...

Страница 6: ...rting intermittent stand by ventilation continuous low exchange continuous high exchange maintenance indicator light and exchange indicator light 4 Airflow Measurement and Balancing Once installation...

Страница 7: ...commended that they be cleaned every two months More frequent cleaning may be required under extremely dirty operating conditions Use a vacuum cleaner to remove the heaviest portion of accumulated dir...

Страница 8: ...suddenly stops the unit stays in defrost all of the time or if control functions are not working properly Ensure that power is reaching the board Test the blower motors and damper actuators for operat...

Страница 9: ...s with adequate slope for drainage Wooden Curb Supplied by others Bolt to Floor Rubber Vibration Isolator Supplied by others U Channel Supplied by others 3 8 10mm Threaded Rod Supplied by others NOTE...

Страница 10: ...CLEARANCE FROM ANY OBSTRUCTION IS REQUIRED FOR REMOVAL OF HEAT RECOVERY CORES FANS ETC THE ACCESS DOOR CAN BE REMOVED FROM CABINET WITH ONLY 2 000 51 OF CLEARANCE CONTROL PLATE ACCESS DOOR HEAT RECOV...

Страница 11: ...A minimum of 6 00 152 clearance from any obstruction is required for removal of control box A minimum of 15 00 381 clearance from any obstruction is required for removal of heat recovery cores fans et...

Страница 12: ...15 000 381 CLEARANCE FROM ANY OBSTRUCTION IS REQUIRED FOR REMOVAL OF HEAT RECOVERY CORES FANS ETC THE ACCESS DOOR CAN BE REMOVED FROM CABINET WITH ONLY 2 000 51 OF CLEARANCE EXHAUST AIR SUPPLY AIR FRO...

Страница 13: ...ement minimum de 12 00 305 est requis pour retirer le bo tier lectronique Un d gagement minimum de 15 00 381 est requis pour retirer les noyaux de r cup ration les ventilateurs etc La porte d acc s pe...

Страница 14: ...3 625 92 2 000 51 14 000 356 1 875 48 3 750 95 40 500 1029 8 000 203 12 250 311 8 000 203 15 250 387 B A 2 000 51 Line Voltage In A minimum of 12 00 305 clearance from any obstruction is required for...

Страница 15: ...Exhaust Air From Building Fresh Air From Outside Min 8 203mm Optional Canvas Vibration Isolator Min 12 305mm VP0001A Min 12 304mm Flow Measuring Station FMS Balancing Damper not supplied Canvas Vibra...

Страница 16: ...pler 3 4 NPT Note All hose pipe couplers to be supplied by others T D i All hose pipe and couplers to be supplied by others Plastic Hose Water Trap 3 4 NPT To Drain Copper or Plastic Pipe Plastic Drai...

Страница 17: ...are dry contacts Low Voltage terminal control consists of the following Wall Control 4 wire LVT 24 gauge minimum Occupied Night set back Timer Sensor 24 VAC needs dry contact LOW COM HIGH Remote fan s...

Страница 18: ...sor occupancy sensor building management system or other The unit will not operate unless these contacts are closed The illustration below shows a factory installed jumper and programmable timer optio...

Страница 19: ...ing JU1 F Extended Defrost Jumper 12 pin 2 pin Med Speed Blue Low To Medium move the fork connector To change the minimum speed setting from from here to here LOW SPEED SETTING 321 FF1 YRGB OL 1 J2 J4...

Страница 20: ...3 3 5 0 9 3 10 9 2 6 6 9 8 5 0 2 4 4 6 1 900 425 8 5 12 4 13 8 6 4 10 2 11 7 4 3 8 1 9 6 2 2 6 0 7 5 0 1 3 9 5 4 800 377 7 0 10 4 11 7 5 2 8 6 9 9 3 4 6 8 8 2 1 7 5 0 6 4 3 3 4 6 700 330 5 1 8 1 9 3 3...

Страница 21: ...MOTOR 1 2 1 2 BK R W R C L M H EXHAUST MOTOR W R BL BK Y C L M H SUPPLY MOTOR W BL R BL BK Y GND L1 NEUT BK W G 120VAC 60Hz WALL CONTROL GREEN WALL CONTROL YELLOW LOW SPEED 3 9 K COM HIGH SPEED STAND...

Страница 22: ...7 6 9 J1 3 2 1 8 1 J2 COMM N C N O t DEFROST TEMPERATURE SENSOR JU1G INTERMITTENT STANDBY SI JU1 F EXTENDED DEFROST 1 2 3 BK Y R G BL BL 1 2 3 4 5 6 8 7 BK Y W BL 115 VOLT RELAY PART 202729 W BL BK Y...

Страница 23: ...6 J1 9 BK R J1 2 W R4 1 R4 2 J1 1 BK W J1 3 T2 1 2 1 2 3 4 5 6 7 8 9 10 11 12 J5 BK R R R W R BL BK Y NOTE 1 W BL R BL MEDIUM SPEED CONNECTIONS BK Y 1 2 1 2 3 4 5 6 7 8 9 10 11 12 J6 R CORE DAMPER MO...

Страница 24: ...stall a dehumidistat option Window frame is too cold or leaky Repair window frame Unit stops functioning Electrical supply interrupted Check the unit circuit breaker Air from supply diffusers too cold...

Отзывы: