Velocity VDOT-STB-SCI Скачать руководство пользователя страница 5

GLT-299-7-8  Rev.  0 

Mar  23,  2018 

making sure the wiring does not obstruct fitting of the detector head.   

 

Fit the detector head by inserting it into the base and turning clockwise until the notch in the detector rim aligns 

with base locking screws. To avoid unauthorized de-installation, turn the locking screw counterclockwise until the 

screw  comes  to  about  4mm(3/16”)  from  the  rim  of  the  base,  as  shown  in  Figure  6.  The  OMNIVIEW

TM 

360° 

indicator permits visibility from any angle. 

 

Figure 6: 

Position of locking screw

 

 

Note: 

Smoke  and  heat  detectors  are  not  to  be  used  with  detector  guards  unless  the  combination  has  been 

evaluated and found suitable for that purpose. 

 

Section 7 – MAINTENANCE 
Maintenance 

The 

VDOT-STB-SCI

 is a high quality product engineered for reliability. In order to obtain optimum performance, 

periodic maintenance is required, at lease in accordance with NFPA 72 chapter 14 “Inspection, Testing and 

Maintenance”. 

 

Routine Inspection: 

Ensure the detector head and the base are secure and undamaged. 

 

Operation Test: 

The purpose of the Operational Test is to confirm the product’s correct operation. 

1) 

When carrying out site testing of the product, the control panel shall be set to “one-man-walk test mode” prior 

to the test. 

 

2) 

Take any necessary precautions to limit the sounding of the alarm sounders/bells and any fire service 

summoning device. 

 

3) 

Detach the detector connected with the base. 

Locking Screw 

Содержание VDOT-STB-SCI

Страница 1: ...ns Otherwise it may cause damage to equipment Note Do not install the product in any location where oil dust iron powder chemicals or hydrogen sulphide may occur or affect the product It may cause dam...

Страница 2: ...GLT 299 7 8 Rev 0 Mar 23 2018 2 5 6 1 SCI indicator Figure 1 Position of terminals Section 3 DIMENSIONS Figure 2 Dimension of VDOT STB SCI mm inch 105 4 133 22 5 0 885...

Страница 3: ...9 7 5 Optional accessory VDOT ADP adapter Use this adapter when VDOT STB SCI is installed with a 4 square electrical box or 4 octagonal electrical box Refer to VDOT ADP Instruction Manual for details...

Страница 4: ...ure 5 Connection to terminals For system monitoring for terminals 1 5 and 6 do not use looped wire under terminals Break wire run to provide monitoring of connections CAUTION Before installing the pro...

Страница 5: ...n has been evaluated and found suitable for that purpose Section 7 MAINTENANCE Maintenance The VDOT STB SCI is a high quality product engineered for reliability In order to obtain optimum performance...

Страница 6: ...nt Consumption Standby 100 A Activated SCI Isolation 22mA SLC Line impedance Up to 50ohms 2km 1 24mile Refer to below SCI On Resistance 0 2ohms max SCI Fault Detection Voltage 10V min Visual Indicator...

Страница 7: ...stion or b at the Zeta s option repayment of the price where this had been paid And the warranty period is three 3 years from the shipment from Zeta s factory 1 3 Notwithstanding anything to the contr...

Отзывы: