Section 6 – CONNECTIONS
Install wiring in accordance with Figure 4 in this document.
All wiring must conform to applicable local codes, ordinances, and regulations.
Control
Panel
NFU-7000
series
1
Base
6
5
1
Base
6
5
Loop +
Loop -
Loop +
Loop -
Figure 4:
Connection to Zeta control panel series
Use cable AWG12-20 for wiring. Do not connect different gauge cables at one
terminal in order to prevent loosening.
! CAUTION
Do not connect cables in reverse polarity. Failure to connect the polarity correctly
could result in damage to the base and/or other equipment.
! CAUTION
Figure 5:
Connection to terminals
For system monitoring - for terminals 1, 5, and 6, do not use looped wire under
terminals. Break wire run to provide monitoring of connections.
! CAUTION
Before installing the product check the continuity, polarity and insulation resistance of all wiring. Check that siting
is in accordance with the site system drawings and conforms to all applicable local codes such as NFPA 72.
In normal use, the
VDOT-STB-SCI
base will be installed at ceiling level. Pass the field wiring through the cable
hole in the center and from the rear of the base. Hold and affix the base to the ceiling or electrical box with screws
via the base mounting holes. Connect the field wiring to the base terminals, as detailed in Section 5 and 6,
Correct Wiring