![Veit Brisay Fuse Master BX Series Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/veit-brisay/fuse-master-bx-series/fuse-master-bx-series_handbook_3859928004.webp)
4
Switching on the Fuse Master BX
1. Switch on main switches.
2. Check if the emergency stop switches must be deactivated
3. Press start button
4. Possibly clean both belts
5. Switch on heating
6. Set the requested temperature on both temperature regulators
7. Set the requested fusing time on the speed regulator
8. Set the requested contact pressure on the pressure regulator
9. After approximately 30 minutes the machine will have reached the
operating temperature and is ready for production.
Switching off the Fuse Master BX
1. Switch the heating off after production has ended.
2. Clean the belts with the cleaning cloth
3. Turn the wiper bar with a clean surface facing the belt.
4. Clean the delivery rail to the cooling belt and the stripping rail with
a soft cloth.
5. Drain the sediment bowl of the air cleaner if necessary.
6. Switch off the main switches of the machine - Approx. 20 minutes
after switching off the heating.
7. Pull the cleaning cloth out of the machine.
Maintenance and servicing
In order to make sure that a fusing machine works problem-free,
it is vital to ensure that regular maintenance and service is
carried out including checking of all major functions. Systematic
service ensures the constant functioning of a fusing machine.
Therefore certain controls and services should be performed by
the maintenance technicians regularly.