● Do not over tighten screws. This can cause damage.
Veilux Model # VP-58CND12X User Manual
INSTALLATION
A. CONNECTIONS
A-1
1. Loose the screws on the domes cover and remove it from the base.
(Screws won’t be removed)
2. Loosen the screws which connect mount cover and Main base and separate dome
cover from the main base. (These are captive screws that do not remove)
3. Connect power to Power and GND.
4. Connect video to video and GND.
5. Connect communication cable to RS-485 connectors.
6. Connect alarm common cables to GND. Connect the alarm input cables to their
relevant terminal (1-4) Alarm polarity can be programmed as N/O or N/C
■ 12VDC type
■
24VAC
type
Website:
www.Veilux.net
Phone # 1-800-510-6528
6
FIG. 2