19
5 Connecting to power supply
VEGAPULS C 22 • SDI-12
58345-EN-200806
5.3 Switch-on phase
After connection to the power supply, the device carries out a self-
test.
Note:
No SDI-12 commands are answered during this self-test
After the self-test, the standard SDI-12 communication is used.
Transmitted values take settings into account that have already been
carried out, e.g. default setting.