![Vega VEGACAP 65 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/vega/vegacap-65/vegacap-65_operating-instructions-manual_3882850016.webp)
16
4 Mounting
VEGACAP 65 • Two-wire
30019-EN-230510
d
d 6
1
2
3
Fig. 7: Filling in the centre, emptying laterally
1 VEGACAP 65
2 Discharge opening
3 Filling opening
Make sure that the max. permissible tensile load of the suspension
cable is not exceeded. The danger of this happening exists particu-
larly with very heavy solids and large meas. lengths. The max. permis-
sible load is stated in chapter "
Technical data
".
Tensile load