6
S
etup
6
.
1
S
etup
S
etup is carried out according to the operating instructions manual of
the respective sensor
.
M
ake sure that the measuring system is in the water for setup
.
T
ip
:
I
f setup is not possible in the original vessel
,
then
fi
ll a suitable vessel
(
ø
approx
.
400
mm
,
height approx
.
150
mm
)
with water and place the
measuring system with
fl
oat inside the vessel
.
T
he measuring result
can be transferred to the original vessel
.
P
roceed as follows
:
1
C
onnect probe and signal conditioning instrument
2
S
witch on power supply
3
T
urn the
A
/
B
switch on the signal conditioning instrument to
position
B
T
he relay deenergizes if an oil layer is detected
(
safe condition
)
0
10
5
521
on
1
2
4
3
5
6
7
8
9
10
11
12
13
14
on
min.
!
VEGATOR 621EX
0
10
5
1
2
F
ig
.
4
:
S
uitable signal conditioning instruments
1
P
otentiometer
2
R
elay control lamp
4
S
et potentiometer
(
1
)
to
0
.
T
he relay control lamp
(
2
)
lights
.
5
T
urn the potentiometer
(
1
)
slowly clockwise until the relay control
lamp
(
2
)
extinguishes
.
6
T
urn the potentiometer
(
1
)
very slowly anticlockwise until the relay
control lamp
(
2
)
lights
.
F
loat for oil
/
water detection
•
for
VEGACAP
63
9
6
S
etup
31595
-
EN
-
100604