Vega TD-11 / User Manual
15
Revision № 06 – 10 August 2021
MOUNTING RECOMENDATIONS
To provide the stable radio between the gateway and the end device is recommended
avoiding the device installation in the places which are barriers for the radio signal getting
through like a reinforced floors and walls, a basement, an underground facilities and wells, a
metal case etc.
The necessary stage for the network deploying including a big quantity of end devices is
a radio planning work with nature experiments.
For mounting you will need:
cross-shaped screwdriver
;
awl;
wire stripper;
laptop.
Step by step mounting be like:
1.
Setting the devices and connecting them to the network are usually carried out in the
office (see Network Deployment Manual).
2.
Determination of suitable places for mounting at the object with a network tester.
3.
De-energizing the connected equipment, metering devices, etc.
4.
Making holes in the silicone gasket for wires - strictly according to the number of
wires. It must be remembered that the wire must be of circular cross-section and no
more than 3 mm in diameter.
When removing the sealant, as well as when installing wires of a
different diameter or cross-section, device performance may
deteriorate until failure due to moisture entering the case
5.
Connecting all necessary wires to the TD-11 contacts.
6.
Device launching – switching to the “Active” mode and registration in the network.