Probe Installation
Access Chamber Installation
GENERAL
The installation of the tank access chamber is the responsibility of the customer or their local site contractor and
not that of Gilbarco S.r.l. / Gilbarco UK. However, there are certain requirements which need to be met to allow
the correct installation of Veeder-Root in–tank monitoring probes. Typical installations are shown in Figure 10 and
Figure 11.
Figure 10. Typical Tank Lid Access Chamber Installation w/o Surge Protector
Figure 11. Typical Tank Lid Access Chamber Installation w/Surge Protector
To allow adequate space for probe installation and servicing, it is recommended that the access chamber is a
minimum 750mm deep and 600mm wide at the base. See Figure 12.
031-1
Riser Assembly
Magnetostrictive
Probe
Field Cables
to Console
031-22a
Riser Assembly
Magnetostrictive
Probe
Dual Channel
Surge Protector
Field Cables
to Console
Tie Surge Protector (PA)
wire to the tank structure;
e.g., using a customer
supplied terminal lug.
Depending
on probe type,
canister material
may be aluminum
or black conductive
polymer.
Depending
on probe type,
canister material
may be aluminum
or black conductive
polymer.
Содержание TLS
Страница 1: ...TLS Magnetostrictive Probes Manual No 577014 031 Revision C International Installation Instructions...
Страница 30: ...Example Isokeraunic Map from IEC Lightning Risk Assessment Tool Germany...
Страница 31: ...For technical support sales or other assistance please visit www veeder com...