Installation
Wiring Power from the Panel to the Red Jacket STP
20
bushing assembly down over the power wires until it seats in its socket in the base of the manifold’s
contractor box leaving sufficient wire lengths for connecting to the pump wires and then tighten the two
screws in bushing assembly securely to compress the bushing and seal the wiring entry.
3.
There will be three wires to the female connector installed in the manifold housing, one to the ground screw
and four from the conduit.
4.
Strip insulation off all eight wires 5/16 of an inch (8mm).
5.
Connect the orange wire from the manifold’s female connector to T1 from the output of the control box.
6.
Connect the black wire from the manifold’s female connector to T2 from the output of the control box.
7.
Connect the red wire from the manifold’s female connector to T3 from the output of the control box.
8.
Connect the attached ground wire in the manifold to the ground wire from the power panel.
9.
Lubricate the O-rings on access covers with petroleum based jelly. Reinstall the access covers. Torque to 35
ft-lbs (50 N•m). Thread sealant should NOT be used.
Refer to Figure 15 for three phase pump example wiring diagrams.
Figure 14. Power Wiring Enters Through Compression Bushing
Plastic rod must
remain in unused
hole
Tighten 2 screws in
top plate of assembly
to compress bushing
Conduit bushing
Contractor's box
access
Capacitor access
Female
connector
Incoming wiring
from power panel
Connect electrical
conduit here, 3/4”-14 NPT
Ground wire
(in manifold)
Orange wire from
female connector
Black wire from
female connector
Red wire
from female
connector