DPLLD Equipment Checkout Steps
5. Enable the Line for Dispensing
34
5. Enable the Line for Dispensing
After completing the DPLLD installation, the console will not enable dispensing from a line until a 3.0 gph test on
the line has been passed. In this step, as you run the required 3.0 gph test, you will also verify that the Pump On
and Pump Off pressures are within their proper operating ranges.