background image

 

Thermostat TOA

 

 

Doc: 70-00-0851A V1.0, 20210716 

© Vector Controls GmbH, Switzerland 

 Page 6 / 10 

Subject to change without notice 

www.vectorcontrols.com 

Connecting the TOA and putting it into operation 

 

 

Important 

The electrical connection of the TOA must be made in accordance to the local regulations. 

 

1.

 

Loosen the locking screw with a Phillips or slotted screwdriver and remove the upper part of the housing. To do 

this, press in the upper part of the housing on the side next to the locking screw slightly so that the locking hook 

disengages (see picture below). 

2.

 

Connect the device according to the connection diagram. To do this, push the cable through the supplied cable 

strain relief (kink protection) and connect it to the terminals. Tighten the terminal screws with max. 0.4 Nm. 

Position the cable strain relief in the housing cut-out and attach cable ties for strain relief (see picture below). 

Note: Open the screw terminal completely to connect the cable correctly. 

3.

 

Only for TOA-T101: Position the jumper J1 according to the operating voltage of the power supply used (see 

picture below). 

4.

 

Close unused housing cable cut out with the supplied blind insert (see picture below). 

5.

 

Apply operating voltage to TOA and observe signal LED (see section "Signal LED", page 7). The signal LED should 

light up green after the device startup and the contact is opened.  

6.

 

Verify the function of the TOA. To do this, disconnect the temperature sensor connected to terminal P4 while the 

device is running. The signal LED flashes red and the contact opens. After successful function test, reconnect 

cable. Signal LED lights up green and contact closes.  

7.

 

Set temperature limit if required (see section "TOA Parameters", page 8) or copy prepared TOA parameters with 

memory device into the TOA (see section "Copy TOA parameters", page 9). Preset are limits of 35°C / 30°C 

(95 °F / 86 °F). 

8.

 

Close the housing. Make sure that the two hooks of the upper part of the housing engage correctly in the lower 

part of the housing and that the hook on the other side engages correctly. Tighten the locking screw (max. 0.5 

Nm). 

 

Open TOA housing 

 

Cable connection with cable lock (example with TOA-T101 and 230 VAC power supply) 

 

 

 

 

Jumper J1 (TOA-T101 only) 

 

 

 

 

Completely loosen the locking screw 

and press here to open the housing. 

24 V

230 V

Power

J1

Place jumper according to the used operating voltage.

 

Содержание TOA-T101

Страница 1: ...limits 20 100 C 4 212 F adjustment range 0 5 C 1 F measuring accuracy Signal LED indicates operating status of Thermostat Temperature can be measured at the device or remotely Easy programming of set...

Страница 2: ...ty Technical Specifications Power supply Operating voltage TOA T101 230 VAC 10 50 60 Hz 24 VAC 10 50 60 Hz 24 VDC 15 34 VDC TOA T102 230 VAC 10 50 60 Hz Power consumption Min 10 VA Safety extra low vo...

Страница 3: ...sions mm inch Mounting and Installation The Thermostat must be mounted on a dry place Temperature sensor selection Use Vector Controls NTC temperature sensors to achieve maximum monitoring accuracy Di...

Страница 4: ...y 230 VAC 50 60 Hz P3 Input Power supply 24 V AC DC P4 Input Temperature sensor NTC 10k at 25 C P6 Connection for OPA S operation terminal Plug P7 Connection for AEC PM2 memory device Plug J1 Connecto...

Страница 5: ...Power supply 230 VAC 50 60 Hz P4 Input Temperature sensor NTC 10k at 25 C P6 Connection for OPA S operation terminal Plug P7 Connection for AEC PM2 memory device Plug LED Signal LED shows operating st...

Страница 6: ...see picture below 4 Close unused housing cable cut out with the supplied blind insert see picture below 5 Apply operating voltage to TOA and observe signal LED see section Signal LED page 7 The signa...

Страница 7: ...ltage for an OFF ON setting of 20 C 25 C 68 F 77 F Signal LED The signal LED on the top of the housing indicates the operating status of the TOA LED Status Description red Output is off The contact is...

Страница 8: ...T key 5 Confirm the IP SEL display with the RIGHT key The first parameter is displayed 6 Change to the parameter IP 03 with the UP or DOWN keys After pressing the RIGHT key the parameter Switching OFF...

Страница 9: ...s set to 7 9 Remove the AEC PM2 memory device and the OPA S operator interface and close the TOA housing see section Connecting the TOA and putting it into operation page 6 Copy parameters to other TO...

Страница 10: ...ector Controls GmbH Switzerland Page 10 10 Subject to change without notice www vectorcontrols com Smart Sensors and Controls Made Easy Quality Innovation Partnership Vector Controls GmbH Switzerland...

Отзывы: