VECO S.p.A.
Via General Cantore 6/8, 20833 Giussano (MB) Italy
C.F. 06633500159 - P.IVA 00832290969
Phone: +39.0362.35321 | Fax: +39.0362.852995 | E-mail - [email protected] | Web: www.veco.net
3.7 – FANCOIL FIXING – FCC MODEL
Fixing can be done using the holes that are there
In the facoil structure itself (see picture 3.16 – 3.17).
Dis 3-17
Dis 3-16
3.8 - CONDENSATION OUTLET
The air-conditioning determines the generation
of the condensation water due to the humidity
of the conditioned air. This condensation water
must be discharged in the bilge or in a special
tank and then by means of a self-priming pump
in the sea.
The water condensation outlet pipe
must be linked to the rubberholders
of 19 mm on the condensation
collection basin.
Each unit is endowed with two condensate
water outlets, as you can see in the picture
above.
If for any reason the condensation discharge pipe has
to be long, it is better to use the special “L” connection.
Installation as in the picture 3.23 must be avoided. In this
situation the condensation water can stop and flow back
to the collection basin because of the boat rocking.
The direct bulkwark outlet is not the best solution, since it can suck up unpleasant
smells due to the exhaust emissions of its own or of other engines.
Please refer to the safety regulations of the different countries.
Dis 3-23
A
A
A
A
A
Dis 3-19
Dis 3-18
Dis 3-21
Dis 3-20
Dis 3-22
Dis 3-24
3 COMPONENTS INSTALLATION