Marquee ACON Ultra Installation/Operation Guide
D-9
37. Locate the ribbon cable on the PCB in the
second slot.
38. Connect the ribbon cable to the first PCB,
as shown.
39. If the video expansion PCB in slot number 2
is not to be replaced immediately, locate the
ribbon cable connector on the PCB in slot
number 3.
40. Plug the connector into the first PCB
Press firmly to seat.
Содержание MARQUEE ACON Ultra Camera Kit
Страница 2: ...VDCDS Doc 79024 01 Revision 2 0 2 07 30 2007 MARQUEE ACON Ultra Operation Maintenance Manual ...
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 19: ......
Страница 31: ...Marquee ACON Ultra Installation Operation Guide 2 8 AU User Controls Settings and Operation ...
Страница 67: ......
Страница 75: ......