Maintenance of the Bus Analog Interfaces (BAIe)
The BAIe is maintenance free.
Installation of the Bus Analog Interfaces (BAIe)
Before you commence installation, please read the notes on
safety on pages 30 and 31.
Installation of the BAIe
Mount the BAIe in the vicinity of the instruments. When selecting the
installation location, remember that the cable between the BAIe and the
analogue instruments may be max. 5 m long.
The cable exit side of the BAIe must point downwards. If the BAIe is to be
installed horizontally, the cable exit side must be angled downwards by >5°.
36
INSTALLATION
Содержание BAI e
Страница 12: ...Connection of a pressure sensor to the BAIe 38 INSTALLATION BAIe Plug 1 1 1 or 1 2 or 1 6 ...
Страница 13: ...Connection of a fuel level sensor to the BAIe 39 INSTALLATION BAIe Plug 1 1 1 or 1 2 or 1 6 ...
Страница 14: ...40 INSTALLATION Electrical installation 3 9 or 3 10 2 11 BAIe Plug 2 2 1 or 2 2 or 2 3 or 2 4 or 2 5 or 2 6 ...
Страница 15: ...41 INSTALLATION Alarm outputs BAIe Plug 3 See page 50 for pin assignment ...
Страница 18: ...44 Power supply BAIe Plug 1 1 11 1 10 1 9 Selection of fuses Fuse 1 5 A Fuse 2 5 A 1 INSTALLATION 2 ...