K6/K6N Vacuum Packaging Machine
Start-up
2002-04-25
Art. no. 519.340
Page 2 2/56
§
Check t hat the machine is running quietly. It must not make any unusual noises. There may be no
error messages on the LED display.
IMPORTANT
If the phase sequence is incorrect, the vacuum pump motor cuts out automatically. The error
message E-03 appears on the LED display. If this happens, change over two of the three phases
of the mains cable on the terminal strip!
IMPORTANT
The machine MUST be switched off before installation, maintenance and repair work is carried
out on it. Before this work gets under way, switch off the main switch and put on a padlock to
prevent the machine being switched on inadvertently. Keep the key out of the reach of other
people!
Содержание K6
Страница 37: ...K6 K6N Vacuum Packaging Machine Operation 2002 04 25 Art no 519 340 Page 37 56 9 5 7 Program table Fig 9 12...
Страница 54: ...K6 K6N Vacuum Packaging Machine Diagrams 2002 04 25 Art no 519 340 Page 5 4 56 17 2 Circuit diagrams...
Страница 55: ...K6 K6N Vacuum Packaging Machine Diagrams 2002 04 25 Art no 519 340 Page 55 56...