18
3. Turn the main electricity supply ON again at the distribution box.
4. Turn the fresh-r
®
ON and wait for approximately 1 minute while the unit boots up.
If you see three illuminated lights and notice fans running, the unit is properly
functioning.
If not:
Check the main electricity supply. If the product still does not work, turn the unit
OFF and contact your supplier.
7 Place the grilles assembly (fi nd the content in Bag B)
Do the following:
1.
Mount the grilles on the outer face of the outside-wall.
2. Place the covers.
NOTICE
The lip of the lower duct pipe should overlap with the edge of the grilles cover so
condensate water is guided from the outer wall.
fi g. 24 Place the grid assembly
Содержание fresh-r On-The-Wall
Страница 9: ...9 fig 6 Check the dimensions of the corner holes before drilling 243 mm 105 mm 111 mm 1055 mm ...
Страница 19: ...19 fig 25 Lip should overlap with the edge of the grilles ...
Страница 28: ...28 15 1 2 fresh r with rectangular duct on top Dimensions are in mm Dimensions in brackets are in inches ...
Страница 29: ...29 15 1 3 Outer wall template Dimensions are in mm Dimensions in brackets are in inches ...
Страница 33: ...33 ...
Страница 34: ...34 ...
Страница 35: ...35 ...
Страница 36: ...www vaventis com 2015 by Vaventis B V All right reserved ...