22
9. Installation checklist
Use the following checklist after you have completed the installation. For a properly functioning
fresh-r
®
, please make sure you can answer all questions with ‘yes’.
Check the following
More information
Yes
No
Are the 4 mounting screws properly functioning?
Page 16 step 6.
Is the bottom duct pipe water tight with PVC Glue
Page 11 step 1.
Are the duct pipes sealed against the the EPP back cover?
Page 12 step 3 & 4.
Are the duct covers sealed against the the EPP back cover?
Page 13 step 5.
Are the duct pipes sealed against the inner wall?
Page 14 step 2.
Are the storm flaps fully open?
Page 15 step 4.
Are the duct pipes properly sealed at the outside wall?
Page 17 step 7.
Does the unit sound normal?
Does the door open and close properly?
Is air blowing from the bottom part of the door?
Is the CO2 indicator glowing green and if not is it green after
1/2 hour?
Содержание fresh-r On-The-Wall
Страница 9: ...9 fig 6 Check the dimensions of the corner holes before drilling 243 mm 105 mm 111 mm 1055 mm ...
Страница 19: ...19 fig 25 Lip should overlap with the edge of the grilles ...
Страница 28: ...28 15 1 2 fresh r with rectangular duct on top Dimensions are in mm Dimensions in brackets are in inches ...
Страница 29: ...29 15 1 3 Outer wall template Dimensions are in mm Dimensions in brackets are in inches ...
Страница 33: ...33 ...
Страница 34: ...34 ...
Страница 35: ...35 ...
Страница 36: ...www vaventis com 2015 by Vaventis B V All right reserved ...