![VAT 653 - AE Series Скачать руководство пользователя страница 67](http://html1.mh-extra.com/html/vat/653-ae-series/653-ae-series_installation-operating-and-maintenance-instructions_855916067.webp)
Series 65
INSTALLATION
980029EB
Edition 2019-10-11
67/103
1.2
Optimizing P gain
WE start by setting the P gain to 1.0 as a trial value and adjust according to the response.
The pump down routine has to be controlled as follows:
Move control valve into close position
Start pump down by opening the pump isolation valve or starting the pump and sending the first pressure
set point to the valve controller. With the example above, the first pressure set point is 510 Torr.
At each new interval (exceeding 10 sec) send the new pressure set point.
Repeat until process pressure is achieved.
While pumping down chamber pressure and valve position should be data logged to compare the actual
pump down curve with the ideal straight pump down line.
If the pressure follows the ideal pump down line with significant delay, the P gain is too low.
If the pressure oscillates around the ideal pump down line or if the valve position oscillates, P gain is too
high.
P gain is optimized if the pressure follows the ideal pump down line closely and the valve position is not
oscillating at all.
Example:
Содержание 653 - AE Series
Страница 64: ...INSTALLATION Series 65 64 103 Edition 2019 10 11 980029EB Example ...
Страница 102: ...APPENDIX Series 65 102 103 Edition 2019 10 11 980029EB 13 Appendix No information entered on time ...
Страница 103: ...Series 65 980029EB Edition 2019 10 11 103 103 This page left blank intentionally ...