VAT 01 Series Скачать руководство пользователя страница 10

 

Installation, Operating, and Maintenance Instructions 

Series 01, DN 16 - 50 (5/8" - 2")

 

 

 

 

VAT Vakuumventile AG, CH-9469 Haag, Switzerland 
Tel +41 81 771 61 61   Fax +41 81 771 48 30   [email protected]   www.vatvalve.com 

271691EB

 

2009-03-09 

10/15 

 

 

Even with disconnected supply, loaded springs and/or air cushions in cylinders can be potential hazards. 

 

 

 

Keep fingers and objects away from the valve opening! 

 
Products returned to VAT must be free of harmful substances such as e.g. toxical, caustic or microbiological ones. If 
products are radioactively contaminated, fill in the VAT form «Contamination and Radiation Report» and send it with the 
product. The form is available at VAT. The maximum values indicated in the form must not be exceeded. 
 
 
 
 
 

5.1  Replacement of actuator/gate assembly 

The figures in brackets refer to the drawing on page 13 

 
  1.  Vent vacuum chambers on either side of valve 
  2.  Open valve 
  3.  Disconnect compressed air 
  4.  Disconnect electrical power 
  5.  Disconnect compressed air line and plug (4) from solenoid and plug (2) from position indicator 
  6.  Remove screws (15) from bonnet 
  7.  Withdraw actuator/gate assembly carefully from body and put it on a clean place 
  8.  Check and clean sealing surfaces of bonnet and valve seat 
  9.  Put new bonnet seal «VATSEAL» (7) on body or bonnet (depending on mounting position) 

 

Attention:

 Bordering of 2 bore holes must be on the body side! 

10.  Insert actuator/gate assembly carefully. At first, insert two screws (15) at both centering holes (bordering) of the bonnet 

seal « VATSEAL» (7) and tighten them slightly only. Afterwards, tighten all screws (15) uniformly in crosswise order 
(diagonal), in 2 or 3 steps, by means of the supplied hexagon pin spanner. 

Notice!

  A suitable torque wrench with the appropriate hexagonal insert to tighten the screws  

 

(tightening torque: 10 Nm) is available from VAT (item 10, 11, 12) 

11.  Connect plug (2) to position indicator 
12.  Connect plug (4) to solenoid 
13.  Connect compressed air 
14.  Perform function and leak test 
15.  Valve is ready for operation 
 
 
 

Содержание 01 Series

Страница 1: ...s indicated on each product as per the label below or similar made in Switzerland Fabrication No patented 010 A Fabrication number Explanation of symbols Read declaration carefully before you start an...

Страница 2: ...s or any other reproduction processes nor may it be manipulated with electronic systems duplicated or distributed without written permission from VAT Offenders are liable to pay damages The original V...

Страница 3: ...ressed air connection 5 2 4 2 Compressed air connection Solenoid separate without solenoid 5 2 4 3 Electrical connection 6 3 Operation 7 3 1 Normal operation 7 3 2 Operation of manual actuator 7 3 3 O...

Страница 4: ...sed Manual actuator 250 C Pneumatic actuator 200 C Position indicator 80 C Solenoid 50 C Position indicator Contact rating 5 A 250 V AC 3 A 50 V DC Solenoid see tag on solenoid The temperatures specif...

Страница 5: ...essed air connection Connect compressed air only if valve has been installed into the vacuum system moving parts cannot be touched With solenoid Connect compressed air to IN internal thread R 1 8 1 8...

Страница 6: ...lenoid Sockets for position indicator and solenoid are supplied with the valve Wire solenoid and position indicator according to the following diagrams Standard solenoid Solenoid for impulse actuation...

Страница 7: ...manual actuator by one hand A higher torque may damage the gate seal 3 3 Operation under increased temperature See Technical data The temperatures specified in the technical data are only admissible...

Страница 8: ...41 Pneumatic actuator single acting with closing spring NC Emergency operation push button Press push button valve closes Release push button valve opens Emergency operation slotted screw Turn in clo...

Страница 9: ...hten the screws if necessary with a torque wrench Remark Do tighten screws crosswise Necessary torque of screws is for DN16 DN50 10 Nm 7 4 lbf ft If you need any further information please contact one...

Страница 10: ...onnect compressed air 4 Disconnect electrical power 5 Disconnect compressed air line and plug 4 from solenoid and plug 2 from position indicator 6 Remove screws 15 from bonnet 7 Withdraw actuator gate...

Страница 11: ...in brackets refer to the drawing on page 13 1 Press out pin 9 by means of tool 8 2 Take new gate 6 and press in new pin supplied with new gate by using the same tool ATTENTION Inspect position of pin...

Страница 12: ...uble acting pneumatic actuator Move gate to the intermediate position by compressed air Gate valve with single acting pneumatic cylinder and closing spring Move gate to the intermediate position by co...

Страница 13: ...rating and Maintenance Instructions Series 01 DN 16 50 5 8 2 VAT Vakuumventile AG CH 9469 Haag Switzerland Tel 41 81 771 61 61 Fax 41 81 771 48 30 CH vatvalve com www vatvalve com 271691EB 2009 03 09...

Страница 14: ...seal 7 91984 R1 6 9 Gate with pin 91983 R1 7 Bonnet seal 65209 01 1 Position indicator Ordering No 010 E22 42 valve with closing spring NC 69250 R1 Ordering No 010 E21 41 valve with opening spring NO...

Страница 15: ...xpense whether consequential special incidental direct or otherwise caused by arising out of or connected with the manufacture delivery including any delay in or failure to deliver packaging storage o...

Отзывы: