Vasco NIVA FC75 Скачать руководство пользователя страница 11

10    ELECTRICAL CONNECTIONS / MAINTENANCE / CLEANING THE OUTSIDE     

ELECTRICAL 

CONNECTIONS

Make electrical connections according to the requirements set out in sections
General Warnings and Foundamental Safety Rules by reference to the patterns
present in the installation and accessories manuals.
Before doing any work, make sure the power is switched off.
The unit must be connected to the mains through a multipolar switch with
minimum contact opening of at least 3mm or with a device that allows the
complete disconnection from the device under the overvoltage conditions
category III.
The FCU must be connected to the mains (230VAC) according to the diagram
below.

Routine maintenance is indispensable to keep the FCU in perfect working 
condition, safe and reliable over the years. This can be done every six months for 
some interventions and annually for others, by the Technical Service Assistance, 
technically authorised and prepared, using always original spare parts.

MAINTENANCE

H2**  Water temperature probe 10kΩ
M1   DC inverter fan motor
S1   grill safety micro-switch
Y1   hot water solenoid valve (230V/ 50Hz 1A
 

output voltage)

L-N   230V/50Hz electrical power supply
BO   boiler demand output (free contact max 1A)
CH   chiller demand output (free contact max 1A)
AIR   Air temperature probe
** 

 If after switching the power on the board

 

detects the H2 probe, start-up occurs in

 

normal conditions with the minimum water

 

temperature when heating (30°C) and

 

maximum when cooling (20°C).

 

The board also has a function when there

 

is no probe, in such cases the fan stop

 

minimum and maximum thresholds are

 ignored.

CLEANING 

THE OUTSIDE

LOCKSHIELD 

ADJUSTMENT

Содержание NIVA FC75

Страница 1: ...R MANUEL D INSTALLATION NIVA CONVECTEUR VENTILO INSTALLATIONSANWEISUNG NIVA GEBL SE KONVEKTOR INSTALLATION MANUAL NIVA FAN COIL UNIT MANUALE DI INSTALLAZIONE NIVA VENTILO CONVECTOR INSTRUKCJA INSTALAC...

Страница 2: ...stallation distances 5 Installation 6 Vertical floor or wall installation 7 Hydraulic connections 7 Condensation discharge 7 Filling the system 8 Evacuating air while filling the system 8 Electrical c...

Страница 3: ...ger Signals to the personnel that the operation described could cause physical injury if not performed according to the safety rules Danger of high voltage Signals to the personnel that the operation...

Страница 4: ...tem to OFF Close the water taps If there is the risk of freezing make sure that anti freeze has been added to the system otherwise empty the system If the room temperature is too low ot too high it is...

Страница 5: ...indications of the manufacturer It is forbidden to pull cut or knot the electrical cables coming out of the appliance even if it is disconnected from the mains supply It is forbidden to poke objects...

Страница 6: ...FC95 FC115 DIMENSIONS A mm 735 935 1135 3 4 D E 5 6 7 B C A 8 E D 2 C B A 1 MACHINE NR PROJECT G3 4 EK G3 4 EK 1X230V PE NL FR DE EN IT PL TECHNICAL DATA 2 PIPES FC75 FC95 FC115 Water contents l 0 47...

Страница 7: ...r flow the installation wall is preferably an outside perimeter wall to allow the discharge of the condensation outside The following descriptions of the various mounting phase and the relative design...

Страница 8: ...brackets 13 12 11 10 9 14 8 7 6 16 15 14 13 12 11 10 9 4 G H J K 3 2 1 L M 5 4 3 2 1 A B C 5 6 7 8 F E D DATUM SCHAAL GET MACHINE NR TEKENING NR ISO B 3650 DILSEN Tel 32 089 79 04 11 Fax 32 089 79 05...

Страница 9: ...ed at the bottom of the side shoulder underneath the hydraulic fixtures If possible make the condensation liquid flow directly in a gutter or a rainwater discharge When discharging directly into the m...

Страница 10: ...ss the valve stopper to open Open all the system interception devices manual or automatic Start filling the device by slowly opening the system water filling tap Take a screwdriver and act on the brea...

Страница 11: ...nsable to keep the FCU in perfect working condition safe and reliable over the years This can be done every six months for some interventions and annually for others by the Technical Service Assistanc...

Страница 12: ...the system load losses To ensure a correct adjustment and balancing of the circuit follow the procedure indicated below With a screwdriver loosen and remove the slotted grub screw inside the hexagonal...

Страница 13: ...12 LOCKSHIELD ADJUSTMENT load losses based on the adjustment of the lockshield present in all kits...

Страница 14: ...3 WAY VALVE diagram of load losses of 3 way valve in completely open position 3 WAY VALVE 13 NL FR DE EN IT PL...

Страница 15: ...diagram of load losses of 3 way valve in completely closed position 14 LOCKSHIELD ADJUSTMENT...

Страница 16: ...do not intervene personally The ventilation does not activate even if there is hot or cold water in the hydraulic circuit The appliance leaks water during the heating function The appliance leaks wate...

Страница 17: ...fully tighten the connections The appliance leaks water during the heating function Leaks in the valve unit Check the state of the gaskets Check the correct positioning of the thermo acoustic insulati...

Страница 18: ...oid if the FCU is used under the aforementioned conditions The installer should contact Vasco for return shipment of defective components The installer will receive a warranty return number The defect...

Страница 19: ...Kruishoefstraat 50 B 3650 Dilsen T 32 0 89 79 04 11 F 32 0 89 79 05 00 info vasco eu www vasco eu 90 DR013038 D...

Отзывы: