75
95
115
DIMENSIONS
Pipeline diameter mm
14
14
16
3
4
F
D
E
5
6
7
B
C
A
8
2
F
1
E
D
3
4
2
C
B
A
1
DATUM
SCHAAL
GET.
MACHINE NR.
TEKENING NR.
ISO
B 3650 DILSEN
Tel. +32 (089) 79.04.11
Fax. +32 (089) 79.05.00
PROJECT
BENAMING
A3
Ventilo Niva SL600
99 Ventilo
JD
25/08/2017
xxx
(1:2)
MOUNTING THE CONDENSATION DISCHARGE PIPE
Connect a pipe adequately to the discharge fitting (A) of the condensation
collection tray. Check that the extension drip (B) is present and correctly
installed.
When starting up the system, make sure that the hydraulic unit lockshield is
open When electric power is still switched off, but the thermo-valve has already
been powered, use the special cap to press the valve stopper to open.
- Open all the system interception devices (manual or automatic);
- Start filling the device by slowly opening the system water filling tap;
- Take a screwdriver and act on the breather of the battery;
- When water starts coming out of the breather valves of the appliance, close
them and continue filling until reaching the nominal value for the system.
Check the hydraulic seal of the gaskets.
It is advisable to repeat these operations after the appliance has been running
for a few hours and periodically check the pressure of the system.
FILLING THE SYSTEM / EVACUATING AIR WHILE FILLING THE SYSTEM 09
ø14mm
A
B
A
discharge fitting
B
tube for the outflow of the liquid
FILLING
THE SYSTEM
EVACUATING AIR
WHILE FILLING
THE SYSTEM
NL
FR
DE
EN
IT
PL
A
A
Venting of the battery
Содержание NIVA FC75
Страница 13: ...12 LOCKSHIELD ADJUSTMENT load losses based on the adjustment of the lockshield present in all kits...
Страница 14: ...3 WAY VALVE diagram of load losses of 3 way valve in completely open position 3 WAY VALVE 13 NL FR DE EN IT PL...
Страница 15: ...diagram of load losses of 3 way valve in completely closed position 14 LOCKSHIELD ADJUSTMENT...
Страница 19: ...Kruishoefstraat 50 B 3650 Dilsen T 32 0 89 79 04 11 F 32 0 89 79 05 00 info vasco eu www vasco eu 90 DR013038 D...