Model # XLGTD52-7K
VAS
®
Page 5
Factory # 33-10944
Assembly Instructions
Note: Please do not fully tighten all bolts until you finish assembling all parts. Once assembled,
go back and fully tighten all bolts. This will make it easier during assembly of unit.
1. Unpack the unit and confirm that you have all the hardware and required parts listed.
2. Align and attach Left and Right Front Posts (C and D) to the front corners of Base Assembly
(B). Screw the Floor Leveler (14) into the center socket on the front rail of metal base.
Lock Washer
(4 used in this step)
⑦
Flat Washer
(4 used in this step)
⑧
1-1/4” Bolt
(2 used in this step)
⑤
Floor Leveler
(1 used in this step)
⑭
3/4” Bolt
(2 used in this step)
③