Page 14
ECS 2M
2.7 POWERING UP
Before powering up the ECS-2M, attach the faceplate to
the casing of the control panel using the six screws
previously removed.
Set Selector knob to position (12).
Upon power up, the unit will test it’s display by briefly
lighting all the segments of its LED. Make sure that all
segments light up.
Following the LED display test, the unit displays the actual
temperature of the room.
If temperature is not displayed, refer to the Trouble-
Shooting section in the appendix of this document.
Fig. 1
One Fan (115V) and One Heating Unit (115V)
www.monitrol.com
Содержание ECS-2M
Страница 8: ...Page 8 ECS 2M www monitrol com ...
Страница 19: ...Page 19 Fig 7 Recommended control backup CHAPTER 2 INSTALLATION www monitrol com ...
Страница 21: ...Page 21 CHAPTER 3 USER S GUIDE www monitrol com ...
Страница 41: ...Page 41 APPENDIX www monitrol com ...
Страница 42: ...Page 42 ECS 2M www monitrol com ...
Страница 48: ...MAV ECS 2M Ver 1 0 June 5 2001 www monitrol com ...