Vantex AL504 Скачать руководство пользователя страница 5

18

3

Radio Equipment

Recommended Engines

• 4-channel radio system (minimum)
• 1 standard servo for throttle
• 5 hi-torque servos

• D-55, Q-50

• Propeller (consult engine instructions)
• Servo Extensions
• Y-Harness

Adhesives

• 6-minute epoxy
• 30-minute epoxy
• Thick CA glue
• Threadlock

Additional Required Items

Tools

• Adjustable wrench (small)
• Drill (drill press preferred)
• Hook and loop straps
• Foam
• Hex wrench
• Hobby knife
• Phillips screwdriver (small)
• Pliers
• Scissors
• Square
• Measuring device (e.g. ruler, tape measure)

The servos used for the control surfaces of this model must have a minimum of 9
of servo torque. The servos with metal gear are strongly recommended.

kg-cm (125 oz-in)

Before beginning the assembly of the model, remove each part from its bag for inspection. Closely
inspect the fuselage, wing panels, rudder, and stabilizer for damage. If you find any damaged or
missing parts, contact the place of purchase.

If you find any wrinkles in the covering, use a heat gun or covering iron to remove them. Use caution
while working around areas where the colors overlap to prevent separating the colors.

Servo Selection

Before Starting Assembly

Step 9

Install the switch for the ignition in the switch hatch on the
side of the fuselage as shown.

Note: As the cowling mounting screw is inside the fuselage under the hatch, you need to open
the hatch before accessing the screw. To open the hatch, just remove the screws holding it on
both sides of the fuselage and lift the hatch from the fuselage.

Step 10

Secure the battery for the ignition inside the fuselage
using a hook and loop strap. Make sure to add a few
pieces of foam between the fuselage and battery to
prevent damage to the battery caused by vibration.
Connect the battery to the ignition switch.

Step 12

Route the vent line from the fuel tank out of the bottom of the cowling.

Step 14

Slide and lock the cowling to the fuselage and
then secure the cowling using two screws.
Mount the propeller and spinner to complete the
procedure.

Step 11

Attach the fuel line from the fuel tank to the carburetor. Make sure the line is from the clunk and not
the vent line.

Step 13

Make any necessary cutouts to clear the engine
components in the cowling. Remove a section
from the bottom of the cowling near the exhaust
pipe for cooling outlet as shown. This opening is
necessary to allow cooling air to pass through
the cowling to prevent overheating of your engine.

Содержание AL504

Страница 1: ...64 8 sq in Flying Weight 7 1kg 15 6 lbs Engine not incl 50 60cc Gas Radio not incl 4 ch 6 servos Construction Balsa and Plywood Features Designed for high performance scale aerobatics High quality balsa and plywood material Light weight and strong construction Foam brace on the back of fuselage Enhanced cowling mounting design Hardware package included High quality prepainted fiberglass cowling an...

Страница 2: ...21 Table of Contents Appendix Parts and Options ...

Страница 3: ...ne is tuned according to the manufacturer s instructions and it will run consistently and constantly at full throttle when adjusted Check all the control horns servo horns and clevises to make sure they are secure and in good condition Replace any items that would be considered questionable Failure of any of these components in flight would mean the loss of your airplane Large models perform much ...

Страница 4: ...405 Left Wing Panel w Aileron for 50cc Edge 540 AL50406 Right Wing Panel w Aileron for 50cc Edge 540 AL50412 Left Stabilizer w Elevator for 50cc Edge 540 AL50413 Right Stabilizer w Elevator for 50cc Edge 540 AL50416 Landing Gear for 50cc Edge 540 AL50417 Wheel Pants for 50cc Edge 540 AL50420 Wing Tube for 50cc Edge 540 AL50421 Stabilizer Tube for 50cc Edge 540 AL50422 Decal Set for 50cc Edge 540 C...

Страница 5: ...n Before Starting Assembly Step 9 Install the switch for the ignition in the switch hatch on the side of the fuselage as shown Note As the cowling mounting screw is inside the fuselage under the hatch you need to open the hatch before accessing the screw To open the hatch just remove the screws holding it on both sides of the fuselage and lift the hatch from the fuselage Step 10 Secure the battery...

Страница 6: ... neutral position Repeat Steps 1 through 5 for the remaining wing panel Step 4 Step 5 Step 6 17 Section 1 Aileron Servo Installation Step 2 The vertical and horizontal base lines are pre marked on the firewall Measure and mark the same distance from the lines for the four engine standoff screws The firewall is already mounted correctly to provide right offset for the engine when the engine standof...

Страница 7: ...ng you will be drilling through this Make sure to drill the hole perpendicular to the centerline of the aileron 16 Step 2 Step 3 Step 4 Step 5 Wrap the receiver battery in foam and use rubber bands or hook and loop straps to secure the battery to the battery tray Assemble the fuel tank correctly Be sure to use the gas compatible stopper and fuel tubing Place foam on the floor of the tank compartme...

Страница 8: ... until the hinge pin center is flush with the leading edge of the aileron Wipe away any excess epoxy with rubbing alcohol Continue installing hinges in the leading edge of the aileron The control surfaces ailerons will be installed after the epoxy is fully cured Note Be sure that the hinge pivot pins are parallel and flush to the aileron leading edge It s important to frequently mix a fresh batch ...

Страница 9: ... full motion several times using your hands This will break free any epoxy that may have found its way into the hinge joint Move the hinge throughout its full travel until no resistance is felt Mix some 30 minute epoxy Place a sufficient amount of epoxy in each of the hinge pockets in one wing panel Carefully attach the aileron to the wing making sure the hinges are inserted in their respective hi...

Страница 10: ...in the servo arm when the aileron is neutral and the servo arm is centered Attach the ball link to the outer hole in the servo arm with a screw and nut as shown Don t forget to use threadlock Repeat Steps 1 through 3 for the remaining servo in the opposite wing panel Step 2 Step 3 Step 4 Required Parts Step 1 Step 2 Note It may be necessary to slightly enlarge the holes in the fuselage for the ant...

Страница 11: ...der Put the threaded rod of the rudder control horn through the hole and secure it with the provided nuts Adjust the position of the rod so that it has the same length on both sides of the rudder Screw the molded swivel link with linkage onto the threaded rod at the right position so that the rudder cable in operation will not hit the opening of the fuselage 3 8 9 Step 3 Carefully slide the remain...

Страница 12: ... cable in the fuselage Carefully remove the covering from the opening using a hobby knife Section 7 Rudder Installation Step 3 Note The technique for installing the control horns in the elevators is similar to the aileron control horn installation Center the elevator servo using the radio system Install a servo arm onto the servo Step 4 Mark a line 3mm 1 8 away from the servo arm and parallel to t...

Отзывы: