This SOP does not necessarily cover all possible hazards associated with the plant and should be used in conjunction with
other references
–
This SOP remains the property of Traffic and Access Solutions Pty Ltd
–
PORTABOOM® brand and designs
are registered trademarks of Traffic & Access Solutions Pty Ltd ABN 162 894 975
PORTABOOM® SET UP
Step
Instruction
Diagram
1.
Once arriving to site, review Traffic
Management Diagram (TMD) and identify
required positions of PORTABOOM® unit(s)
on site.
“
MANUAL TRAFFIC CONTROL
”
TA2/TA21 sign
is to be placed in accordance with dimension
“C” sign spacing.
Diagram F2.14a is based on diagram F2.14
TWO-WAY TWO-LANE ROAD, single lane
alternating flow which has been modified to
incorporate the PORTABOOM® unit.
Note
: PORTABOOM® Operators are to
remain at least 2m away from the live lane
an d in a safe location.