Vanguard FBST Скачать руководство пользователя страница 9

www.desatech.com

105116-01D

Figure 5 - Minimum Clearance -  

Front View 

42" Min.

0" to Wood Floor

8" Min.

0" Min. Clearance to 
Upper Frame/Wallboard

Ceiling

4" Min. from the Perpendicular
Side Wall to the Edge of Facial

1/2" Min. Clearance
to Combustibles

44 

1

/

4

"

24"

Figure 6 - Minimum Clearance - Top View

Minimum clearances to combustibles are:

•  Sides of outer casing 

0" min.

•  Drywall to sides and top of 

0" min.

   front face

•  Ceiling to opening 

42' min.

•  Floor (see 

Minimum Wall

 

0" min.

 

and Ceiling Clearances

, note C)

•  Perpendicular walls  

4' min.

  Right and Left

•  Distance to Facing Walls 

36" min.

See Figures 5 and 6.

iNSTaLLaTiON

Continued

Mantel Clearances for Built-In 
Installation

If placing custom mantel above built-in firebox, 

you must meet the minimum allowable clearance 

between mantel shelf and top of firebox opening 

shown in Figure 7. These are the minimum allowable 

mantel clearances for a safe installation. Use larger 

clearances wherever possible to minimize the heating 

of objects and materials placed on the mantel.

 CAUTION: Do not allow the 

vent-free gas log heater to touch 

or  extend  beyond  the  firebox 

screen. 

If your installation does not meet the above mini-

mum clearances in Figure 7, you must:

•  raise the mantel to an acceptable height,

OR

•  remove the mantel.

Figure 7 - Minimum Mantel Clearances 

for Built-In Installation

Supplied 
Firebox Hoods
Must Be Used
at All Times

Wire-mesh

Screen

Firebox Top

Mantel Shelf

3"

6"

1

/

4

"

Combustible 
Material 1 

1

/

2

Max Thickness

Note:

 All vertical

measurements are 

from top of fireplace

hood to bottom of

mantel shelf. These

minimum clearances

replace any other

recommended

clearances supplied

with your ANS Z21.11.2

approved gas logs.

Wall board or facing material 
(above firebox) may be of
combustible material, including 
decorative mantel ornaments
or other similar projections 
off  of the facing material.

Top Frame
(Combustible Material)

12" 15" 18"

Note:

 Do not

cover louver 
openings.

7" Min. 

BUILT-IN FIREBOx INSTALLATION

Built-in installation of this firebox involves installing 

firebox into a framed-in enclosure. This makes the 

front of firebox flush with wall. Optional perimeter 

brass trim accessories are available (see 

Accessories

page 18). The brass trim will extend past sides of 

firebox approximately 1/2". This will cover the rough 

edges of the wall opening. If installing a mantel above 

the firebox, you must follow the clearances shown 

in Figure 7. Follow the instructions below to install 

the firebox in this manner.

1.  Frame in rough opening. The firebox framing 

should be constructed of 2 x 4 lumber or heavier. 

Construct framing using dimensions shown in 

Figure 8 and 9, page 10. It is recommended that 

the framing be constructed first and the unit 

be placed in position by removing the nailing 

flanges from one side. After sliding the unit into 

place, the outer most flanges may be replaced 

and nailed to the framing on all sides before 

applying the wallboard to the exterior framing.

Содержание FBST

Страница 1: ...ce WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch Do not use any phone in your building Immediatelycallyourgassupplierfromaneighbor s phone Follow the...

Страница 2: ...local codes Aftermarket Completion of sale not for purpose of resale from the manufacturer State of Massachusetts The installation must be made by a licensed plumber or gas fitter in the Commonwealth...

Страница 3: ...een hood and brick liner in place Make sure these parts are in place and screens are closed before running firebox The supplied hoods may not be replaced with hoods which may be provided with a log he...

Страница 4: ...ng model num ber serial number clearances etc is located directly above thebricklinerandundertheheat shield See Figure 20 page 15 Product Features Operation This firebox is designed for use with appro...

Страница 5: ...to insure proper fresh air for this and other fuel burning appliances in your home Today s homes are built more energy efficient than ever New materials increased insulation and new construction meth...

Страница 6: ...ating only if there are doorless passageways or ventilation grills between them AIR FOR COMBUSTION AND VENTILATION Continued DETERMINING FRESH AIR FLOW FOR Firebox LOCATION Determining if You Have a C...

Страница 7: ...two perma nent openings one within 12 of the ceiling and one within 12 of the floor on the wall connecting the two spaces see option 1 Figure 3 You can also remove door into adjoining room see op tio...

Страница 8: ...cause mildew to form from too much moisture See Air for Combustion and Ventilation page 5 IMPORTANT Make sure the firebox is level If firebox is not level log set will not work properly Note Your Vang...

Страница 9: ...mes Wire mesh Screen Firebox Top Mantel Shelf 3 6 9 1 4 Combustible Material 1 1 2 Max Thickness Note All vertical measurements are from top of fireplace hood to bottom of mantel shelf These minimum c...

Страница 10: ...Wiring Firebox page 12 5 Carefully set firebox in front of rough open ing IMPORTANT If installing brass trim kit see instructions included with brass trim accessory You must install shoulder screws fr...

Страница 11: ...firebox enclosure where it can be accessed with a key through a wall as shown in Figure 13 Depending on the type of installation some local codes may require you to install two 2 manual shutoff valve...

Страница 12: ...orepressure testing gas piping Damage to gas valve may result and an un safe condition may be caused The appliance and its individual shutoff valve must be disconnected from the gas supply piping syst...

Страница 13: ...de door panel forward and up to remove tabs on panel from locating slots in firebox see Figure 16 3 Locatethetwostripsofhookandloopmounting strips on one side of the base of the lower com partment Ali...

Страница 14: ...th Blower Receptacle Hook and Loop Mounting Strips Control Knob Lock Nut Speed Control Shaft Figure 18 Installing Optional Blower GA3500A Operating Optional Blower GA3500A Light your gas appliance wit...

Страница 15: ...rners and circulating air passageways of the appliance be kept clean WARNING Children and adults should be alerted to the hazardsofhighsurfacetempera tures and to stay away to avoid burnsorclothingign...

Страница 16: ...Illustrated Parts Breakdown Model FBST These items are used on both sides of fireplace 8 14 16 16 16 7 1 7 2 2 16 11 16 12 6 6 6 15 15 15 15 13 13 10 5 15 15 15 15 6 6 15 15 4 15 15 15 15 15 15 15 4 1...

Страница 17: ...cer 4 5 26731 Deflector Hood 2 6 26740 Nailing Flange 8 7 1 02013 Side Refractory Brick Liner 2 7 2 02014 Bottom Refractory Brick Liner 2 8 24007 Side Refractory Retainer 4 9 12125 Screen 4 10 26752 E...

Страница 18: ...with the FBST fireboxes for bidirectional heat circula tion and may be installed during or after firebox installation Brass Trim GA6093 Easily clips around firebox to provide a finished appearance co...

Страница 19: ...___________________________________ ______________________________________________________ ______________________________________________________ ______________________________________________________...

Страница 20: ...ring a defective heater will be the responsibility of the owner TO THE FULL EXTENT ALLOWED BY THE LAW OF THE JURISDICTION THAT GOVERNS THE SALE OF THE PRODUCT THIS EXPRESS WARRANTY EXCLUDES ANY AND AL...

Отзывы: