Installation and Replacement
3-15
Cabling the Vanguard 342
Port Numbering for
Physical Ports 1
and 2
Daughtercards installed in ports 1 and 2 must be configured correctly. For example,
if you have installed a Dual E&M daughtercard in port 1 you must configure the port
as an E&M port. In addition, use this port numbering scheme when configuring the
Vanguard 342:
Note
For more daughtercard configuration information, refer to Chapter Five of the
Daughtercard Installation Guide
(Part Number T0020).
Daughtercard
Cable Information
Cables for optional daughtercards are shipped with the daughtercards. If your
Vanguard 342 is shipped with pre-installed daughtercards you will receive the
cables. For daughtercard installation and more cable information, please refer to the
Vanguard Daughtercard Installation Guide
(Part Number T0020).
5
RJ45
10/100BaseT
10/100BaseT Adapter
cable
or standard UTP cable
(RJ45-to-RJ45)
10/100Mbps Auto
Sensing
Interface # 1
8RJ45
10/100BaseT
10/100BaseT Adapter
cable
or standard UTP cable
(RJ45-to-RJ45)
10/100Mbps Auto
Sensing
Interface # 2
Port
Connector
Interface
Cable Required
(Application Specific)
Speed
DCE/DTE
(continued)
If the daughtercard is
installed in...
...and it has one port
connector, configure
port
...or it has two port
connectors,
configure port
Port 1
1
1 or 6
Port 2
2
2 or 7
Содержание 342
Страница 1: ...Vanguard Managed Solutions Vanguard 342 Installation Manual...
Страница 10: ......
Страница 16: ...xvi Varning Varning r den mest allvarliga beteckningen och den indikerar att du kan skadas fysiskt...
Страница 18: ......
Страница 20: ......
Страница 54: ......
Страница 88: ......
Страница 108: ......
Страница 110: ......